Laserfiche WebLink
I able I) <br />Permit :~rca Description :lcrca};c <br />I. Suil;Overburdcn 14.R <br />2. Sediment Pond ~•y <br />3. Internal Roads IZ.S <br />4. Gas Lines & Power Line RI~Ws 9.24 <br />i. 4lining Pit I 30.71 <br />G. Mining Pit 2 31.1 <br />7. Ivtining Pit 3 55.1 <br />`S. Mining I'it 4 '` I `? <br />'Total Permit :area "'-'t•54 <br />Note that the processing area will move during the mining of the 1 S Road Pit, so it has hewn <br />included in the areas described above. The processing facilities will be located in or next to each <br />pit as it is mined. <br />dining will progress through the Pits numerically. The topu[il and overburden from a new urea <br />will he used to reYlaim the previous area as well as create [hc wetlands which have been <br />previously described. This will reduce material moving as well as reduce thr maximum area to <br />be reclaimed. Any tines tn>m the crushing%screening olxxrmion will also be salvaged and used in <br />the reclamation. A table ofexpceted mining lives for each Pit is included in'1'able D-3. ~Il[e life <br />ot'cach Pit is based on the. anticipated annual a~~era~ tonnage. <br />1 ? Ru~r~l Pi! 1-'rhruur•v (l7 U-± <br />