Laserfiche WebLink
EXHIBIT L RECLAMATION COSTS (cont) <br /> EST/MATED UNIT COSTS FOR RECLAMATION/TEMS• <br /> Unit Cost <br /> 1 . Revegetation includes grass seed mix, mulch, <br /> fertilizer and labor to drill . . . . . . . $487.56/ac <br /> 2 . Dewatering pump costs, includes pump, pump <br /> station, and hoses (7500 gpm) . . 600.00/day <br /> 3 . Re-spreading soil and/or growth media with <br /> D-9 cat2/, push distance 250 ft or less . . . 0. 159/YD3 1/ <br /> 4 . Sloping using cut/fill method on lake slopes <br /> D-9 cats/, push distance 80 ft or less . . . . . . . . 0.098/YD3 1/ <br /> 5 . Sloping using cut/fill method on terrace slopes <br /> D-9 catV, push distance 40 ft or less . . . . . . . . 0.098/YD3 1/ <br /> 6. Trees, includes planting costs. . . . . . . . . 3 .24/tree <br /> RECLAMATION COSTS <br /> 1. Revegetation, 30.00 ac @ $487.56/ac $14, 626. 80 <br /> 2 . Dewatering 28 days @ $600.00 /day 16, 800.00 <br /> 3. Resoiling, push distance less than 250 ft. , <br /> ( 19, 179 yd3 x 1 .23 swell) @ $0.159/yd3 3,513 .64 <br /> 4 . Lake area sloping using cut/fill method <br /> ( 12,427 yd3 x 1 .23 swell) @ $0.098/yd3 1,534.72 <br /> 5. Terrace area sloping using cut/fill method <br /> (3, 645 yd3 x 1 .12 swell) @ $0.098/yd3 450. 17 <br /> 6. Tree planting 357 trees @ $3 .24/tree 1, 156.68 <br /> 7 . Reseeding costs 15.0 ac @ $487.65/ac 7, 313.40 <br /> Net Total $ 45,395.41 <br /> B. Indirect costs <br /> Mobilization (haul 12 miles one way) 836.52 <br /> Insurance, Bond, 6 Profit 5, 685 .78 <br /> 9 . Administration costs 4,539.54 <br /> TOTAL ESTIMATE 56,457 .25 <br /> RECOMMEND BOND BE SET AT $56,500.00 <br /> 1/ Figured using Cat Handbook and rental costs from local sources for 831 efficiency, D-9 <br /> dozer, for eastern Colorado. <br /> ]/ This equipment in for cost astimating only and the actual equipment used by the permittoe <br /> my vary. <br /> 18 <br />