My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-09-03_REVISION - M1977129
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977129
>
1999-09-03_REVISION - M1977129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2021 9:43:28 AM
Creation date
11/21/2007 2:15:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977129
IBM Index Class Name
Revision
Doc Date
9/3/1999
Doc Name
CONST MATERIALS REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Type & Sequence
AM2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L RECLAMATION COSTS (cont) <br /> EXPLANATION QUANTITY UNITS <br /> Soil depth 9.00 Inches <br /> Terrace bank slope cut/fill volumes 1.80 cy/iff <br /> Lake bank slope cut/fill volumes 6.67 cy/If <br /> Soil swellfactor 1.12 <br /> P Cut/fill swell factor 1.23 <br /> it;... ...................... <br /> ... ...... <br /> . ...... ............. <br /> Description AMOUNT UNITS_ <br /> Area 100% of lake depth 51.67 Acres <br /> maximum depth 15.50 Feet <br /> length of 3:1 slopes 7,634 feet <br /> length of 2:1 slopes 3,006 feet <br /> length of %A slopes 4,735 feet <br /> Volume of water on 3:1 slopes 150.0 cft/Ift <br /> Volume of water on 2:1 slopes 125.0 cft/Ift <br /> Volume of water on %:I slopes 60.75 cft/Ift <br /> Gallon conversion factor 7.48 Gal/cft <br /> Transit-iissivity, 8 117,000 gal/day <br /> Pump rate minimum 7,500 gpm <br /> MES <br /> Slope water volumes <br /> 3:1 slope capacity 8.565,348 gal <br /> 2:1 slope capacity 2,809,675 gal <br /> % :1 slope capacity 2,149,359 gal <br /> 100% depth 260,9511.398 gal <br /> Total pumping volume 274,475,780 gal <br /> Pumping time <br /> Dewater lake 25.41 Days <br /> Recharge factor for inflow during 0.29 Days <br /> sloping time <br /> Slope grading time 1.44 Days <br /> TOTAL PUMPING TIME 27.14 Days <br /> NO IF pumping time roan ded to nart ful day <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.