Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT tDENTIFICA710N <br />Task # : 007 <br />Date : 03/15/2007 <br />User : RCO <br />State :Colorado Permit/job # : M-1981-021 <br />County :San Miguel Abbreviation :none <br />Site :West Sunday Mine Filename :M021-007 <br />Agency or organization name :DRMS <br />Permit or other job action : TR-3 Reclamation <br />Task description :Rip compaction on top of waste <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br />Dozer operatingcost/hour : $98.84 100 <br />Ripper operating cost/hour : $7.51 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cosUhour : $212.05 Total fleet cost/hour : $212.05 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA <br />Area : 2.50 acres Rip depth (ft) : 1.00 <br />Bank volume : NA <br />Volume : 4,033 <br />BCY <br />BCY or CCY <br />Source of estimated quantity :TR-3 map <br />Source of estimated load factor : NA <br />HOURLYPRODUCTION - - - -- <br />Alternate methods - <br />Seismic : Seismic velocity : NA feet/second <br />Unadjusted production : NA cu. ytls./hour <br /> <br />Area : Avg. ripping depth : 1.00 feetpass <br />Average ripping width : 7.67 feeUpass <br />Average ripping length : 400.00 feeUpass <br />Average dozer speed : 88.00 feeUminute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.881 acres/hour <br />Unadjusted production : 1,421.72 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) <br />Unadjusted production <br />per selected method : 1,421.72 cu. yds./hour <br />Site altitude <br />Altitude adjustment <br />Job effciency factor <br />Net jab correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />5,800 <br />1.00 feet <br />(Cat HB) <br />0.83 (1 shift/day) <br />0.83 multiplier <br />1,180.02 cu. yds./hour <br />1,180.02 cu. yds./hour <br />3.42 hours <br />Unit cost : $0.180 per cu. yd. Total job cast : $725 <br />