Laserfiche WebLink
Agency or organization name :DRMS <br />Permit or other job action :TR-3 Reclamation <br />Task description :Rip and grade access road <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : l.per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br />Operating cost/hour : $98.84 100 <br />Ripper op, cost hour : $3.76 50 <br />Operator cosVhour : $32.78 NA <br />Total unit cost/hour : $208.29 Total fleet cosUhour : $208.29 <br />> ;; , <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,000 CCY factor : 1.215 volume : 1,215 LCY <br />Source of estimated volume : Tr-3 map <br />Source of estimated swell factor :na <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Decomposed rock - 75% Rock, <br />0.00 % (i <br />5,800 feet <br />3,300 Ibs/LCY <br />25% Earth <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 {1shifVda~ <br />Spoil pile : 0.70 (fnd-mf) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.70 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.27 <br />Adjusted unit production <br />Adjusted fleet production <br />576.66 <br />576.66 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 2.11 Hours <br />Unit cost : $0.361 /LCY Total job cost : $439 <br />