Laserfiche WebLink
CIRCES Cast Estimatino Software <br />PROJECT IDENTIFICATION <br />Task # : 005 <br />Date : 03/15/2007 <br />User: RCO <br />State :Colorado <br />County :San Miguel <br />Site :West Sunday Mine <br />PermiUjob# : M-1981-021 <br />Abbreviation :none <br />Filename : M021-005 <br />Agency or organization name : DRMS <br />Permit or other job action :TR-3 Reclamation <br />Task description :Grade dump slopes, pad and portal areas <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source: (CRC) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br />Operating cosVhour : $98.84 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cosUhour : $204.53 Total fleet cosUhour : $204.53 <br />> _._. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4,800 CCY factor : 1.215 volume : 5,832 LCY <br />Source of estimated volume :TR-3 <br />Source of estimated swell factor :na <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly production <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 10.00 % (r <br />Average site altitude : 5,800 feet <br />Material weight : 3,300 Ibs/LCY <br />Weight description <br />normm~ncPd rock - 75% Rock, 25% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost: $0.528 /LCY <br />150 feet <br />910.5 LCYlhr <br />__. <br />~ondltion Correction Factors <br />Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.00 (Cat HE <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshiff/dt <br />Spoil pile : 0.80 (fnd-rf, <br />Push gradient : 1.22 (Cat HE <br />Altitude : 1.00 (Cat HE <br />Material weight : .0.70 (Cat H! <br />Blade type : 1.00 (S/SU/( <br />Net correction : 0.43 <br /> <br />Adjusted unit production : 387.13 LCY/hr <br />Adjusted fleet production : 387.13 LCYlhr <br />Total job time : 15.06 Hours <br />Total job cost : $3,081 <br />