My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-16_REVISION - M1981021
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981021
>
2007-03-16_REVISION - M1981021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:22 PM
Creation date
11/21/2007 1:56:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981021
IBM Index Class Name
Revision
Doc Date
3/16/2007
Doc Name
Recalc of Bond Amount/ Notice of Bond Increase
From
DRMS
To
International Uranium (USA) Corp.
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Agency ororganization name :DRMS <br />Permit or other job action : TR-3 Rec__ 3 faiiiati°n <br />Task description :Spread topsoil on <br />IPMENT COST <br />basic machine : <br />Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Shift basis : <br />1 per day <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper pats source : (CRG) <br /> Utilization <br /> <br />Cost Breakdown : Ownership cosUhour <br />: $72.92 NA <br />100 <br />Operating cost/hour : $98.84 <br /> <br />Ripper op. cosUhour <br />: $0.00 0 <br /> <br />Operator cosUhour <br />: $32.78 NA <br /> <br />Total fleet cost/hour ~ <br /> <br />$204.53 <br />Total unit cosUhour : $204 53 <br />................... <br />nn eTERIAL QUANTITIES <br />Initial <br />volume : 100 CCY <br />Source of estimated volume : TR-3 <br />Source of estimated swell factor , na <br />HOURLY PRODUCTION <br />Swell <br />factor : 1.215 <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Loose sfockpile <br />Average push gradient : 0.0~ ° 1l <br />Average site altitude : 5,800 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth -Dry packed <br />Loose <br />volume : 122. LCY <br />............. <br />Job Condition Correction ac ors <br />Operator skill <br />Material consistency :_ <br />Dozing method :_ <br />Visibility :_ <br />Job efficiency :. <br />Spoil pile :_ <br />Push gradient:- <br />Altitude :_ <br />Material weight :_ <br />Blade type :_ <br />Net correction :_ <br />Adjusted unit production <br />Adjusled fleet production <br />JOB TIME AND COST pozer(s) Total job time <br />Fleet size : 1 <br />Total lob cost <br />Unit cost : $0.349 /LCY <br />0.75 <br />1.20 <br />1.00 <br />1.00 <br />0.70 <br />1.00 <br />1.00 <br />0.90 <br />1.00 <br />0.47 <br />Source <br />PROJECT 1DENTlFIGA I lurv Permit/job# : M-1981-021 <br />Task # : 008 State :Colorado <br />Abbreviation :none <br />pate : 0 3/1 512 0 0 7 County :San Miguel <br />Filename : M021-008 <br />User : RCO Site :West Sunday Mine <br />
The URL can be used to link to this page
Your browser does not support the video tag.