My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-08_REVISION - M1987064
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987064
>
2004-10-08_REVISION - M1987064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:38 PM
Creation date
11/21/2007 1:51:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987064
IBM Index Class Name
Revision
Doc Date
10/8/2004
Doc Name
Bond Increase
From
DMG
To
Sandco Inc
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatino Software <br />TRUCKING -ONLY WORK <br />Agency or organization name :OMG <br />Task fl: 046 State :COloratlo Permii(ob K: M-1987-064 <br />Date: 10/07/2004 Counry:La Plafa Abbreviation none <br />User: RCO Site :Sandco Pit Filename:M064-04b <br />Permit or other job action :Amendment f <br />Task description :Haul topsoil /ot toad atea <br />HOURLY EQUIPMENT COST <br />Model :Generic 8-10 cy, 6x4 <br />Cost Breakdown : Job utilization <br />Ownership cosVhour: $12.62 NA <br />Operating cesUhoun $19.34 100 <br />Operator cest/houn $21.72 NA <br />Total unit cosifhour: $53.68 Total fleet cosVhour <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 550 CCY factor : 1.215 volume <br />Source of quantity take-off :Application <br />Source of estimatetl swell factor : na <br /> <br />Material purchase cost : $0.00 /LCY Total cost <br />HOURLY PRODUCTION <br />Hauling CaoaciN: <br />Truck Payload (weight) Basis <br />Material weight: 1,600 pountlsr <br />Material description <br />Top Soil <br />Rated payloatl: 27,280 pountls <br />Payload capaciTy: 1705 LCY <br />Truck Bed (volume) Basis <br />668 LCY <br />$0 <br />Struck volume: 8.00 LCY <br />Heaped volume : 10.00 LCY <br />Average volume: 9.00 LCY <br />Adlusted volume: 9.00 LCY <br /> Source <br />Truck Cvcle Time : Exchange time (min.) : 0.50 (Car HB) <br /> Loatl time (min.) : 1.55 (Cat HB) <br />0.20 mile haul trip at: 20.0 mph (avg.)= Haul time (min.): 0.60 (mi./mph)x60 <br /> Dump time (min.): 0.80 (Car He) <br />0.20 mile return trip at: 20.0 mph (avg.) = Return time (min.) : 0.60 (mi./mph)x60 <br /> <br /> Total cycle time: 4.05 minutes <br />Job Condition Correction Pastors : <br /> <br />Average Site altitude 6,580 feet Adjusted Hourl Truck Production <br />Altitude adjustment factor: 1.00 (Car HB) <br />Job efficiency facloc 0.83 (1 shiN/day) Unadjusted unit production : 133.33 LCYMour <br /> Adjusted unit production: 110.67 LCYMour <br />Netjob correction : 0.83 Adjusted fleet production : 221.33 LCYMour <br />JOB COST <br />Fleet size : 2 Truck(s) Total job time: 3.02 Hours <br />Unit cost : $0.485 /LCY Total joD cost : $324 <br />Shift basis : 1 per day <br />Horsepower: 235 <br />Weight (UST) : 6.36 <br />Cost data source : (CRG) <br />$107.36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.