My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-08_REVISION - M1987064
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987064
>
2004-10-08_REVISION - M1987064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:38 PM
Creation date
11/21/2007 1:51:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987064
IBM Index Class Name
Revision
Doc Date
10/8/2004
Doc Name
Bond Increase
From
DMG
To
Sandco Inc
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />task x : 04a state :Colorado Pennitlob n : M-1987-064 <br />Date: 10/07/2004 County:La P/afa Abbreviation:none <br />User: RCO Site :Sandco Pif Filename:M064-04a <br />Agency or organization name :OMG <br />Permit or otherjob action :Amendment 1 <br />Task description :Load topsoil for hauling to road area <br />HOURLY EQUIPMENT COST <br />Basic machine : CAT 966G <br />Attachment no. 1 : ROPS Cab <br />Horsepower: 235 <br />Shitt basis : 1 per day <br />Data source : (CRG) <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 550 LCY <br />Ownership co <br />Operating ce <br />Operator w <br />Total unit co ofal fleet cosUhour <br />Source of quantity takeoff :Ap{ <br />Source of estimatetl swell factor : NA <br />HOURLY PRODUCTION <br />Loatler Cwle Time Unadjusted basic cycle time (loatl, dump, maneuver) <br />$75.28 <br />550 Lcv <br />(Cat HB) <br />0.500 ~ minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Material3/4° fc 6" diameter 0.000 (Caf HB) <br />Stockpile : Conveyor or tlozerpiled 101t. high or less 0.010 (Caf HB) <br />Truck ownership: NO adjustment-factor not applicable 0.000 (Cat HB) <br />Operation : Inconsistent operation 0040 (Cat HB) <br />Dumptarget: NOminal target 0.000 (Cat He) <br />Net cycle time atljustment: 0.050 minutes <br />Adjustetl basic cycle time: 0.550 minutes <br />Rollins Resistance -Road Conditions <br />Haul :Rutted dirt, little maintenance, no wafer, 2"fire penetration <br />Return :Rutted dirt, little maintenance, no water, 2" fire penetration <br />Haul antl Retum Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 30 0.00 5.00 5.00 0.0667 (Cat HB) <br />Return route : 30 0.00 5.00 5.00 0.0622 (Cat HB) <br />Total travel time: 0.7289 minutes <br />Loader Bucket CaoaciN Total cycle time : 0.679 minutes <br />Rated capacity: 4.75 LCV (heaped) (Cat HB) <br />Bucket fill factor: 1.100 Other-rocWdirt mixtures (100-1200 <br />Adjusted capacity: 5,23 LCV <br />Job Condition Correction Factors <br />Site altitude: 6,580 feet <br />Source <br />Altitutle atljustment factor: 0.92 (Cat HB) <br />Job efficiency factor: 0.83 (l shitVday) <br />Net correction : 0.76 multiplier <br />Unadjusted hourly unit production: 461.78 LCY/Hr <br />Adjustetl hourly unit production : 352.61 LCYMr <br />Adjustetl hourly fleet production : 352.61 LCYMr <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) <br />Unit crost $0.214 /LCV <br />Utilization % <br />sUhour. $30.54 NA <br />sVhour: $14.10 50 <br />sUhour $30.65 NA <br />sf/hour: $75.28 T <br />Swell Final <br />factor: NA volume: <br />(Cat HB) <br />Total job time : 1.56 <br />Total job cost : $117 <br />HOUrs <br />
The URL can be used to link to this page
Your browser does not support the video tag.