My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-08_REVISION - M1987064
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987064
>
2004-10-08_REVISION - M1987064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:38 PM
Creation date
11/21/2007 1:51:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987064
IBM Index Class Name
Revision
Doc Date
10/8/2004
Doc Name
Bond Increase
From
DMG
To
Sandco Inc
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 005 <br />Date : 10/07/2004 <br />User : RCO <br />Agency or organization name :DMG <br />Permit or other job action :Amendment 1 <br />Task description :Spread topsoil on haul road <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series II - BSU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $50.51 NA <br />Operating cost/hour : $61.43 100 <br />Ripper op. cost hour : $0.00 0 <br />Operator cost/hour : $24.01 NA <br />Total unit cosUhour : $135.95 Tota l fleet cosUhour : $135.95 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 550 LCY factor : NA volume : 550 LCY <br />Source of estimated volume :Application <br />Source of estimated swell factor :na <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Top Soil <br />State :Colorado <br />County :La Plata <br />Site : Sandco Pit <br />10.00 / (ne, <br />6.580 feet <br />1.600 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />1 Dozers) <br />$0.105 /LCY <br />Job Condition Correction Factors <br />Operator skill : 0.75 <br />Material consistency : 1.20 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 1.22 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 0.92 <br />Source <br />Adjusted unit production : 1289.11 LCY/hr <br />Adjusted fleet production : 1,289.11 LCY/hr <br />Total job time : 0.43 Hours <br />Total job cost : $58 <br />Permitfjob# : M-1987-064 <br />Abbreviation :none <br />Filename : M064-005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.