My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE33557
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE33557
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:58 PM
Creation date
11/21/2007 1:48:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982121
IBM Index Class Name
Enforcement
Doc Date
6/27/1996
Doc Name
MID-CONTINENT QUARRY
From
PITKIN IRON CORP
To
BLM
Violation No.
MV1992024
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07/03/95 13:57 FA% 9709 958 DIANE DELANEY ~J004 <br />.71D~27-1996 1550 ~EERT DELAY 303 9-05 230.3 P, D2 <br />Mr. Michael s. Mottles <br />June 27, 1996 <br />Page - ~ <br />$3,713, and this additional sum would be advanced by Pitkin Iron <br />to Mid-Continent Resources to be added ae surety for the <br />reclamation boad_ <br />a. Mid-Continent/Pitkin Iron and BLM would resolve <br />the disputed ownership of the previously quarried material on the <br />basis that Pit]cin Iron would remove the material over a 5 year <br />period, with payment to BLM of a royalty in the amount of $.75 <br />per cubic yard. <br />5. The appeal would be withdrawn. <br />H.ealematiaa. <br />In keeping with our diacuasion at the April meeting, we <br />have done further evaluation of the existing reclamation plan and <br />believe it to be essentially sound, and a good plan for <br />reclamation of this site. under the circumstances, it would be <br />neither wise nor prudent for Mid-Continent Resources, the permit <br />holder, to maze commitments which would result in an increase in <br />the cost of reclamation and the amount of the bond, and we see ao <br />genuine reclamation benefit in doing so. <br />SLM hoe indicated some concern with reclamation of the <br />road®, specifically that the cut slopes be stabilized and <br />adequate cross drainages be provided, consistent with the natural <br />drainage patters. We believe these can be addressed within the <br />scope of the current reclamation plan sad bond amount by a <br />clarification that Chia ie intended- Specifically, we would <br />agree: <br />Reclamation of haul reads 1 & 2 should include <br />installation of awalee and/or rolling dips, to be <br />armored with rack material on-site, where the roads <br />cross drainages. <br />est/Noeeieez <br />06/28/95 14:18 TX/RX N0.0344 P.002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.