Laserfiche WebLink
Table D-4: Mine Schedule (cont.) <br />Stage B <br />Task # escription ime needed <br />ears <br />1 Stri to soil from Phase B1, Remove houses from Phase BI .02 <br />2 Stri to soil from Phase B2, and mine Phase B1 .78 <br />3 Stri to soil from Phase B3, mine Phase B2, and reclaim Phase B 1 .71 <br />4 Stri to soil from Phase B4, mine Phase B3, and reclaim Phase B2. 5.04 <br />5 ine Phase B4, and reclaim Phase B3, Remove houses from Phase <br />5 5.36 <br />Total 19.89 <br />Stage C <br />Task # escription ime needed <br />ears <br />1 Strip topsoil from Phase 6, mine Phase 5, reclaim Phases A4 and <br />4 1.39 <br />2 Stri to soil from Phase 7, mine Phase 6, reclaim Phase 5 1.79 <br />3 Stri to soil from Phase 8, mine Phase 7, reclaim Phase 6 .43 <br />4 Stri to soil from Phase 9, mine Phase 8, reclaim Phase 7 .21 <br />5 Stri to soil from Phase 10, mine Phase 9, reclaim Phase 8 1.92 <br />6 Stri to soil from Phase 11, mine Phase ]0, reclaim Phase 9 1.09 <br />7 Stri to soil from Phase 12, mine Phase 11, reclaim Phase 10 0.99 <br />8 Strip topsoil from Phase 13, mine Phase 12, reclaim Phase 11 0.32 <br />9 ine Phase 13, reclaim Phase 12 0.04 <br />10 eclaim Phase 13 ~ 0.02 <br />Total 12.20 <br />7. Schedule of Operations <br />Mining operations may occur year round but will normally occur 48 weeks throughout the year. The <br />operator will not have any night mining operations, although minor truck activity or repairs may <br />occur after hours. Mining processing and trucking will normally take place no more than 12 hours <br />per day, six days per week. <br />Haldorson Sand and Gravel Mine 17 <br />