My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-04-06_REVISION - C1984065
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1984065
>
1990-04-06_REVISION - C1984065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 8:41:40 PM
Creation date
11/21/2007 1:36:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Revision
Doc Date
4/6/1990
Doc Name
MIDTERM REVIEW FINDINGS DOCUMENT
From
MLRD
To
NEW CASTLE ENERGY CORP
Type & Sequence
MT2
Annual Report Year
1989
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Coal Ridge No. 1 Mine - 2 - April 6. 1990 <br /> Since the renewal was issued the permittee has submitted an application for a <br /> Permit Revision which updates the previous permit application document and <br /> requests permission to mine coal . If this Permit Revision is approved by the <br /> Division, the reclamation-only status of the permit may be changed, and an <br /> updated Findings Document will be prepared by the Division. Otherwise New <br /> Castle Energy Corporation is required to complete backfilling, grading, <br /> seeding, and mulching of the site, in accordance with the approved reclamation <br /> plan, by December 10, 1990. This Mid-Term Review is being carried out <br /> assuming only reclamation activity, as that is the current status of the <br /> permit: <br /> Status of Conditions and Stipulations <br /> Condition No. 1 <br /> UPON APPROVAL OF THE RENEWAL APPLICATION, THE APPLICANT SHALL COMMENCE <br /> IMPLEMENTATION OF THE RECLAMATION PLAN AND COMPLETE ALL• BACKFILLING, GRADING, <br /> SEEDING AND MULCHING OPERATIONS AS REQUIRED WITHIN ONE (1 ) CALENDAR YEAR OF <br /> PERMIT ISSUE. <br /> This condition is currently in effect. The deadline for the above reclamation <br /> operations is December 10, 1990. <br /> Stipulation No. 3 (as modified by Technical Revision 4) <br /> THE DIVISION REQUIRES THAT COAL RIDGE NO. 1 MINE SUBMIT AN ANNUAL REPORT BY <br /> JANUARY 15 OF EACH YEAR INCORPORATING THE FOLLOWING: <br /> BEDROCK WELLS AND ALLUVIAL/COLLUVIAL WELLS <br /> OW-3L, OW-12 <br /> OW-4L, OW-13 <br /> OW-7, OW-14 <br /> OW-8 <br /> THESE WELLS ARE TO BE SAMPLED ON A BIANNUAL BASIS (TWICE A YEAR) AND THE <br /> SAMPLES ANALYZED FOR THE FOLLOWING PARAMETERS. <br /> Ca CO3 <br /> Mg SO4 <br /> Na NO3 <br /> K Fe <br /> HCO3 Cl <br /> SAR Conductivity (lab) <br /> TDS pH ( lab) <br /> This stipulation is currently in effect, and hydrology monitoring is ongoing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.