My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-04-06_REVISION - C1984065
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1984065
>
1990-04-06_REVISION - C1984065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 8:41:40 PM
Creation date
11/21/2007 1:36:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Revision
Doc Date
4/6/1990
Doc Name
MIDTERM REVIEW FINDINGS DOCUMENT
From
MLRD
To
NEW CASTLE ENERGY CORP
Type & Sequence
MT2
Annual Report Year
1989
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Coal Ridge No. 1 Mine - 3 - April 6, 1990 <br /> - -, Stipulation No: 13 <br /> - -- THE RECLAMATION PLAN FOR THE MINE SHALL BE REVISED TO INCLUDE DOWNSIZING OF <br /> THE CURRENT ACCESS AND TEMPORARY HAUL ROAD FROM ITS PRESENT 40 FOOT WIDTH TO A <br /> MAXIMUM WIDTH OF 20 FEET: RECLAMATION OF THE REMAINDER OF THIS ROAD SHALL BE <br /> CONDUCTED ACCORDING TO THE APPLICABLE REQUIREMENTS OF RULE 4.03.1 (7). <br /> -- The required revision has not been submitted to the applicant, therefore this <br /> -' Stipulation is still in effect. <br /> Stipulation No. 14 <br /> THE APPLICANT WILL RECLAIM ALL LIGHT-USE EXPLORATION ROADS EXCEPT THOSE <br /> SPECIFICALLY REQUESTED TO BE RETAINED BY THE LAND OWNERS. THE RETAINED ROADS, <br /> HOWEVER, WILL HAVE THE SURFACE, CUTS, AND FILL RE-SEEDED BY THE APPROVED SEED <br /> = MIXTURES TO CONTROL EROSION. <br /> - Since final reclamation activities have not'yet commenced at the site, this <br /> Stipulation is still in effect. <br /> =Stipulation No. 15 <br /> THE RECLAMATION PLAN FOR THE MINE SHALL BE REVISED TO INCLUDE REGRADING OF THE <br /> PORTAL AREAS, INCLUDING RELATED WORKING PADS AND ACCESS ROADS, TO A CONDITION <br /> THAT APPROXIMATES THE ORIGINAL SITE TOPOGRAPHY AS INDICATED BY THE BACKGROUND <br /> CONTOURS ON THE N.C.E.C. PRELIMINARY GRADING PLAN MAP, SCHMUESER & ASSOCIATES, <br /> REVISED 4/10/88. TOPSOIL DISTRIBUTION AND REVEGETATION OF THE REGRADED PORTAL <br /> AREAS WILL BE CONSISTENT WITH THAT APPROVED FOR THE REMAINDER OF THE MINE SITE, <br /> This revision to the reclamation plan has also not been submitted by the <br /> permittee, therefore the Stipulation is still in effect. <br /> Section III - Bonding <br /> The Division holds an approved reclamation bond in the form of Certificates of <br /> Deposit in the amount of $288,000.00. Calculations indicate that the <br /> permittee has a reclamation liability of $188,000.00 for the current <br /> disturbance. Under the reclamation-only status of the permit, therefore, the <br /> bond amount is deemed sufficient to assure completion of the reclamation plan. <br /> BC/es <br /> cc: Mike Savage <br /> Mr. E. Peter Mattheis, NCEC <br /> 5709F <br />
The URL can be used to link to this page
Your browser does not support the video tag.