My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-04-06_REVISION - C1984065
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1984065
>
1990-04-06_REVISION - C1984065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 8:41:40 PM
Creation date
11/21/2007 1:36:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Revision
Doc Date
4/6/1990
Doc Name
MIDTERM REVIEW FINDINGS DOCUMENT
From
MLRD
To
NEW CASTLE ENERGY CORP
Type & Sequence
MT2
Annual Report Year
1989
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br /> MINED LAND RECLAMATION DIVISION of nor <br /> Department of Natural Resources �, o <br /> ,. <br /> 1313 Sherman Sl.,Room 215 <br /> Denver,CO B0203 • n 8 <br /> 303 866-3567 *��ara��• <br /> FAX: 303 832-8106 <br /> Roy Romer, <br /> Governor <br /> Fred R.Banta, <br /> DATE• April 6, 1990 Division Deemor <br /> TO: Coal Ridge No. 1 Mine (C-84-065) File <br /> FROM: Bill Crick'") <br /> RE: Mid-Term Review <br /> This memo presents the results of the Division's mid-term review of New Castle <br /> Energy, Inc. 's Coal Ridge No. 1 Mine. This review was conducted to fulfill <br /> the requirements of Rules 2.08.3, 2.06.2(10). 2.06.3(4), 2.06.5(3), 2.06.7(5), <br /> and 3.02.2(4). <br /> Rule 2.08.3 requires that the Division conduct a review of each permit issued <br /> prior to its mid-term, in this case 1-1/2 years. Based on this review, for <br /> good cause shown. the Division may require reasonable revision or modification <br /> of the permit to ensure compliance with the Act and Regulations. <br /> Rule 2.06.2, 2.06.3, 2.06.5, 2.06.7 require that experimental practices, <br /> mountaintop removal variances, variances from AOC, and variances from <br /> contemporaneous reclamation be reviewed by the Division during the mid-term <br /> review. These Rules are not applicable to the Coal Ridge No. 1 operation. <br /> Rule 3.02.2(4) requires that the Division review the amount of the bond and <br /> the terms of acceptance of the bond. <br /> The original mining and reclamation permit for the Coal Ridge No. 1 Mine was <br /> issued to Storm King Mines, Inc. on November 11 , 1985. with a permit term of <br /> three years. The name of the company was subsequently changed to New Castle <br /> Energy Corporation, An application for permit renewal was received by the <br /> Division on April 12, 1987. Numerous adequacy issues from the previous <br /> mid-term review were outstanding at the time. Following more than a year of <br /> attempts to gain financing, New Castle Energy formally requested a permit <br /> renewal allowing only reclamation activities on January 17, 1989. <br /> The permit for the Coal Ridge No. 1 Mine was renewed on December 10, 1989, <br /> allowing only reclamation activities, and for a permit term of 3 years, At <br /> that time adequacy issues pertinent to the reclamation plan were resolved, <br /> several of which required Stipulations to the permit. Since the renewal took <br /> place no revisions have been approved by the Division, therefore the status of <br /> the permit has not changed. For this reason the Division is requiring no <br /> revision of the permit at this time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.