Laserfiche WebLink
CIRCES Cost Estlmatlnq Software <br />Agency or organization name : OMG <br />Task#: 001 State: Lolwado Penni6job #: M-1991-054 <br />Dale' 04/192002 County: Bagvache Abbreviation:none <br />User: RCO Site: Ro#tt Mine Filename: M054-002 <br />Permit or otherjob action :Bond review <br />task tleacription :Tram waste rock /tom tlump to cut slope (upperpadJ <br />HOURLY EQUIPMENT COST ~_~~ Baslc machine: CAT 4488 hackhce losdcv ~~~ Horsepower 102 <br />Attacbmen[no.1:ROPS Cab Shin basis: )per day <br />Cost Breakdown: Ownership wsVhour $1256 Cost daft source: (CftG) <br />Operating cosUhouc $18.09 100 %job utilization <br />Operator cosVhouo $27.99 <br />Total unit cosUbour $58.63 Total Beet cos6hour: $58.63 <br />yam-- ~.-.... _~._. -._-.._..._.;_.. <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume: $200 CCY factor: 1.165 volume: 3,718 LCV <br />Source of quantity take-oV: inspection 9/99, approved reclam plan <br />Source of estimated swell Terror nFa <br /> <br />HOURLY PROOUOTION <br /> (Cat HBJ <br />Loatler Cvda Time Unatljustetl basic cycle time (load, tlump, maneuver): 0.450 minutes <br />~Cwle Time Factors ~ ~ Factor (min.l ~ Source <br />Material: Maferia/3/4"fo 6'diamefer 0.000 (Cef HB) <br />Stack ile: No ad(usfinenf-lacfwxt~pplicable 0.000 (Cal HB) <br />truck ownership: No adjustment-lector not applicable 0000 (Cat HB) <br />Operation: No adjustment-taclm not applcable 0.000 (Cat HBJ i <br />Dumptarget: Nominal target 0000 (Ce[HB) <br />Net cycle time atljusbnen[: 0.000 minutes <br />Adjusted basic cycle time: 0.450 minutes <br />Rollins Res stance - Roatl Cond bons <br />Haul :Rutted did, little mainfenaxa, no wafer, Y fire penebefion <br />Return : Rutted tlid, little mainfenanca, no water, 2'tira pene#ation <br />Haul antl Retum Time Length Grade res. I Rolling res. ~ Total res. I Travel Vme I Data <br />(teed f%1 (%1 (%1 (minutes) Source <br /> Total Vaval time: 0.569 minutes <br />Loatler Bucket Capacity Total cycle time: 1.019 minutes <br />Rated capacity: 1.50 LCY (heaped (Cat HB) <br />Bucket fill fagot 1.100 Other-mck/dirt mixtures (100-120%) <br />Adjustetl capacity: 1.65 LCV <br />Job Condition Correction Factors Source <br />Site altitude: 11,800 feet AlfRUda adjustment factor 083 (Cal HB) <br /> Job efficiency factor- 0.83 (1 shiNday) <br /> <br /> Net correction: 0.69 multiplier <br />Unadjusted hourly unit production: 97.18 LCY/Hr <br />Adjusted houdy unit production: 66.94 LCYMr (Cat HB) <br />Adjusted houdy fleetpmtluction: 66.94 LCV/Hr <br /> <br />JOB TIME ANO COST <br />Fleet size: f Loatler(s) Tmal job time: 55.69 Hours <br />Unit cost $0.876 /LCY Totaljob cost $3,165 <br />