Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT {DENTIFICATION <br />Task # : 003 <br />Date : 02/19/2002 <br />User: RCO <br />State : Colorado Permit/job# : M-1991-054 <br />County : Saguache Abbreviation :none <br />Site : Proffitt Mine Filename : M054-003 <br />Agency or organization name : DMG <br />Permit or otherjob action :Bond review <br />Task description :Push up of <br />HOURLY EQUIPMENT COST <br />material at 3:1, bac~l/ against <br />Basic machine : Cat D5C Series 3 - 5P <br />Blade type : Power Angle Tilt <br />Attachment no. 1 : BOPS Cab <br />Attachment no. 2 : NA <br />at 3:1 <br />Horsepower: 90 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $12.09 NA <br /> Operating cost/hour : $21.12 100 <br /> Ripper op.cosUhour : $0.00 NA <br /> Operator cosUhour : $27.99 NA <br /> Total unit cosUhour : $61,19 Total fleet cosUhour : $61.19 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2, 778 CCY factor : 1.165 volume : 3,236 LCY <br />Source of estimated volume : 9J99 insp: 250' x 20', 1.5:1 reduce to 3:1 <br />Source of estimated swell factor : n/a <br />~ ~ ~ ~~ <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 306.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rQ <br /> Push gradient : 0.79 (Cat HB) <br />Average push gradient : 10.00 % (pos) Altitude : 0.96 (Cat HB) <br />Average site altitude : 11, 800 feet Material weight : 0.79 (Cat Hi3) <br /> Blade type : 1.00 (PAT) <br />Material weight : 2, 900 Ibs/LCY Net correction : 0.27 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 82.37 LCYfhr <br /> Adjusted fleet production : 82.37 LCY/hr <br />_--. -._ _...~_ _.__~m~ _~ ._.__~ ~__ _.__. i~ <br />JOB TIME AND COST <br />Fleet size : 1 Dozens) Total job time : 39.29 Hours <br />Unit cost : $0.743 /LCY Total job cost : $2,404 <br />} <br />i-._..~_ ._.. _ ~_ _...__~.- ._. _ . _____ _ __ ._ __ .~.___.__ ._ ~. <br />