Laserfiche WebLink
CIRCES Cast Estimating Software <br />Agency or organization name <br />Task#: 001 State ~. COlmado PermiVjob#: M-1991-054 <br />pate: 01/1911002 County: Saguache Abbreviatlon:none <br />User: RCO Srte'. Fitt Mine Filename: M054-001 <br />Permit or other job action :Bond review <br /> Task tlescription: BacMlll voids in collapsed IowerpaKal <br /> <br /> <br />HOVRLV EQUIPMENT COST Basic machine: CAT 4468 beckhoe Made- Horsepower 102 <br /> Attachment no.l:ROPS Ceb Shi#basis : lper tlay <br /> Cos[6reaktlown: Ownership cosVhouc $12.56 Cos[data souma : (GRG) <br /> Operating wsVhouc $1H.09 100 %job udliza[ion <br /> Operator cosVhouc $27.99 <br />Total unit cosf/houc $58.63 Total fleet cosVhour: <br />Initial Snell Final <br />volume: 30 LCY factor NA volume: 30 LCV <br />Source of quantity fake-o# :approved plan, er99 inspection <br />Source of esGmaled svrell factor: Na <br />(Gat HBJ <br />Loader CVda Tme Unadjusted basic cycle time (loaq dump, maneuver): 0.950 minutes <br />Cycle Tima Factors Factor (mint Source <br />Material: Bank arbroken material 0.040 (Cal HB) <br />Stockpile: Nc adjustmept-hcfornof app/Mable 0.000 (Cat HB) <br />Truck ovmership~ No adjustment-{adcr not applicable 0.000 (Cat HB) <br />Operation : No adjustment -Iactn not applicable 0.000 (Cat HB) <br />Dumptarget: No adjustment-{acfornot applicable 0.000 (Wf HBJ <br />Net <yde time adjustment: 0.090 minutes <br />Adjusted basic cycle time: 0.490 minutes <br />Rollins Resistance • Road Contlitions <br />Haul :Rutted dirt, little maintenance, no wafaC 2'!ae penefretion <br />Return :Rutted dirt, little maintenance, no water; Y fire penebafion <br />Haul antl Retum Time ~ Length ~ Grade res. ~ Rolling res. ~ Total res. Travel time Oata <br /> Total travel time: 0.367 minutes <br />Loader Bucket CaoaciN Total Cycle time: 0.857 minutes <br />Rated capacity: 1.50 LCY (heaped (Cat HO) <br />Bucket fll factor: 1.100 Other-rock/did mixtures (100-110%) <br /> <br />Adjustetl capacity: 1.65 LCY <br />Job Contlitlon Correction Factors Source <br />Site altitude: 11,800 heel Alfitutle adjustment factor: OB3 (Cat HB) <br /> Job efriciency factor. 0.83 (1 shiOHay) <br /> <br /> Net correction: 0.69 multiplier <br />Unadjus[etl hourly unit production: 11550 LCVMr <br />Atljustetl howdy unit producton: 7957 LCYMr (pogrem) <br />Adjusted hourly fleet production: 79.57 LCYMr <br />JOB TIME ANO COST ~ ~ ^~ <br />Fleet size: f Loader(s) ToGljob brae: 0.38 Hours <br />Unk cost <br />i ~_ $0.737 <br />~_.. /LCV <br />...__-~ Totaljob cost <br />._ .~..~. ___.._ $21 <br />_... _~_.,..~..! <br />