My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-07-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 1:19:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2003
Doc Name
Phase IV PSSA Area Cert Report
From
DMG
To
Cripple Creek & Victor Gold
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 24,2003 -37- 003-2203.7 <br />. The following sections present a detailed description of each of the above activities. <br />6.1.1 Conformance Testine <br />Geomembrane manufactured by Poly-Flex was installed in the PSSA. A Golder representative <br />performed geomembrane conformance sampling at the Poly-Flex plant in Grand Prairie, Texas. <br />Samples were sent to Golder's geosynthetic laboratory in Duluth, Georgia, for conformance testing. <br />Geomembrane rolls were not used on the project unless approved by Golder based on conformance <br />test results. <br />Prior to the 40-mil and 100-mil geomembrane arrival to site, Golder performed 23 conformance tests <br />at a frequency of one test per 118,655 square feet, exceeding the minimum specified testing frequency <br />of one test per 150,000 square feet. Testing frequency was based on Golder's inventory of the 40-mil <br />and 100-mil geomembrane. Conformance testing for the 40-mil smooth, 100-mil smooth, 100-mil <br />single-sided textured, and 100-mil double-sided textured LLDPE geomembrane used to construct the <br /> Phase Nb PSSA liner system met specifications. Conformance test results are presented in <br />. Appendix M. <br />6.1.2 De~yment Monitorine <br />Geomembrane panel deployment monitoring performed by Golder included: <br />• Observation of panel surface condition and panel overlap; <br />• Assignment of panel numbers; <br />• Verification of factory roll number and receipt of complete certification prior to <br />allowing deployment; <br />• Measurement of sheet thickness; <br />• Documentation of deployed panel lengths; <br />• Development of panel layout record drawing; and <br />• Observation of Phase Nb PSSA/Phase III tie-in. <br />LJ <br />1:\00@30110J00\FnICenP55A0601\OOJ2303.OJ00.013J3Re0.doc Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.