My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-07-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 1:19:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2003
Doc Name
Phase IV PSSA Area Cert Report
From
DMG
To
Cripple Creek & Victor Gold
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 24, 2003 -36- 003-2203.7 <br />6.0 GEOSYNTHETIC CQA TESTING AND MONITORING <br />The following sections describe the CQA activities performed by Golder for the geomembrane <br />installed in the Phase IVb PSSA, and the geosynthetics installed in the LDT and Underdrains. <br />In accordance with the Golder CQA Plan, when a Golder monitor observed deficiencies, the monitor <br />determined the nature and extent of the problem and notified Poly-Flex and/or CC&V. When <br />unsatisfactory test results identified a deficiency, Golder performed additional tests to define the <br />extent of the deficient area. Poly-Flex corrected deficiencies to meet the requirements of the <br />specifications, and Golder retested and/or approved the corrected deficiency prior to any additional <br />related work. <br />6.1 PSSA Geomembrane <br />CQA activities conducted by Golder during the installation of the LLDPE geomembrane in the <br />Phase Nb PSSA consisted of the following: <br />• • Conformance sampling and testing of the geomembrane; <br />• Observation and approval of the SLF or BF surface prior to deployment of <br />100-mil single-sided textured LLDPE geomembrane, 100-mil double-sided <br />textured LLDPE geomembrane and 100-mil smooth LLDPE geomembrane <br />(lower liner); <br />• Observation and approval of the LVSCF surface prior to deployment of 100-mil <br />smooth, 100-mil single-sided textured or 100-mil double-sided textured <br />geomembrane (upper liner); <br />• Observation and documentation of geomembrane deployment, including <br />verifying sheet thickness and overlap and documenting panel layout; <br />• Observation of trial seam sample testing and documentation of results; <br />• Observation and documentation of field seaming; <br />• Identification of destructive seam sample test locations, observation of <br />destructive seam sample testing, and documentation of test results; <br />• Observation and documentation of geomembrane repairs; and <br />• Observation and documentation of non-destructive pressure testing of fusion <br />seams and vacuum testing of extrusion seams and repairs. <br />umo¢zozioaoov'n1CenP55AO60.TOOazzoa.oaoo.o~wa~p.a« Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.