My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-07-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 1:19:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2003
Doc Name
Phase IV PSSA Area Cert Report
From
DMG
To
Cripple Creek & Victor Gold
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tune 24,2003 -9- 003-2203.7 <br />I ~ • Caterpillar D10M Dozer (2); <br />• Caterpillar 426 Backhoe; <br />• Caterpillar 966 Loader; <br />• Caterpillaz 980F Loader; <br />• Caterpillar 992D Loader; <br />• Caterpillar 992G Loader; <br />• Water Trucks (2); <br />• Caterpillar 14G Motor-Grader; <br />• Caterpillar CS563 Compactors (3); <br />• Caterpillar 120 Trackhoe; <br />• Caterpillar 312 Trackhoe; <br />• Caterpillar 3306 Trackhoe (2); <br />• Caterpillar 375 Trackhoe <br />• 777 Haul Trucks (6); and <br />• Ingersoll-Rand EMC 660 Drill Rig (2). <br />Weather data from the period of February 2001 through August 29, 2002 are presented in the 2002 <br />Phase Na Certification Report. Table 2 presents a summary of the weather during the period of <br />August 30, 2002 through June 24, 2003 for the Phase Nb PSSA construction activities. <br />2.1 Underground Workings Remediation <br />Historic underground workings within the footprint of the Phase Nb PSSA were remediated <br />following the approved remediation plans presented in Drawing No. 12 of the IFC Drawings. <br />A summary of the underground workings remediation is presented in Table 3. This table shows the <br />working identification, location {northing and Basting), type of working, remediation quantities, and <br />comments. The following provides a summary of the general remediation methods for the <br />underground workings within the Phase Nb PSSA footprint. <br /> <br />L\Op\220J\OdOpU+nICertPSSA0603\OOR20J.0000.0]3J)Rep.Oac Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.