My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-07-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 1:19:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2003
Doc Name
Phase IV PSSA Area Cert Report
From
DMG
To
Cripple Creek & Victor Gold
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />I • <br />L._J <br />June 24, 2003 <br />-8- <br />2.0 SUMMARY OF EARTHWORK CONSTRUCTION <br />Earthworks activities associated with the Phase IVb PSSA included the following: <br />003-2203.7 <br />• Underground workings remediation, including excavation, confirmatory drilling, <br />installation of CSB, FSB, CP, CR, and geogrid; <br />• Primary and Secondary Underdrain construction, including trench excavation; <br />installation of UF, SSF, geosynthetics, and sump construction; <br />• Leak Detection system construction, including trench excavation; installation of <br />pipe, LDF and geosynthetics construction; <br />• Site grading, including cuUfill and blasting; <br />• PSSA subgrade preparation; <br />• SLF installation, placement and compaction, depth verification testing, and <br />preparation of SLF surface for geomembrane deployment; <br />• BF installation, placement and compaction, depth verification testing, and <br />preparation of BF surface for geomembrane deployment; <br />• PSSA double liner system installation, consisting of two layers of geomembrane <br />separated by LVSCF; <br />• LVSCF placement between geomembrane layers and placement of Low Volume <br />Solution Collection pipes; <br />• Placement of the Low Volume Solution Collection risers; <br />• SDCF placement in the PSSA around the vertical risers; <br />• DCF placement above the upper geomembrane layer; and <br />• Placement of High Volume Solution Collection pipes and riser plates. <br />Ames generally used the following equipment during construction: <br />• Caterpillar D6M Low Ground Pressure (LGP) Dozer; <br />• Caterpillar D7H Dozer; <br />• Caterpillar D9R LGP Dozer; <br />• Caterpillar D8R LGP Dozer; <br />• Caterpillar D9R Dozer; <br />I:\OOUSO110d00V'nICmP55A06W\0032203.Oi00.Ol3ARep.doc Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.