My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-07-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 1:19:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2003
Doc Name
Phase IV PSSA Area Cert Report
From
DMG
To
Cripple Creek & Victor Gold
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 24,2003 -7- 003-2203.7 <br />• destructive tests, which were used by Golder to develop test summaries and the geomembrane panel <br />layout drawing. <br />1.6 Certification Boundary <br />Figure 2 presents the boundary of the Phase IVb PSSA that is being certified in this report. The <br />certification boundary coincides with the limits of the Phase Nb PSSA liner system and includes the <br />following: <br />Phase Nb PSSA limits to elevation 9624: Underground workings remediation; <br />underdrain construction; leak detection system construction; site grading; <br />subgrade preparation; SLF placement and compaction; upper and lower 100-mil <br />smooth, single-sided textured and double-sided textured geomembrane <br />installation; LVSCS placement including LVSCF, piping and riser; SDCF <br />placement; DCF placement; and High Volume Solution Collection pipes; <br />• Between Phase Nb PSSA and Phase III: Site grading; subgrade preparation; <br />SLF placement and compaction; 100-mil single-sided textured geomembrane <br />installation; and DCF placement; and <br />• Phase Nb PSSA limits to elevation 9606: BF installation, placement and <br />compaction on the Phase III ore slope including 100-mil geomembrane <br />installation, and LVSCF and DCF placement. <br />1.7 Items Not Covered in Phase IVb PSSA Certification Report <br />Items that will be addressed in the Phase Nb OSA Certification Report will include the following: <br />• Underground workings remediation; underdrain construction; leak detection <br />system and sump construction; site grading; subgrade preparation; SLF <br />installation, placement and compaction; 80-mil geomembrane installation; DCF <br />placement; and High Volume Solution Collection pipes outside of the Phase Nb <br />PSSA limits, but within Phase Nb; <br />• BF installation, placement and compaction on the Phase III ore slope including <br />100-mi[ geomembrane installation, and LVSCF and DCF placement between <br />elevation 9606 to 9636; <br />• Surface water controls; and <br />• East and west PSSA End Berth construction <br /> <br />~:~omzzoa~oaoo~rmCmrssrowsoozzzo3.aoo.ovwa~o-a« Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.