June 24,2003 -6- 003-2203.7 <br />• If construction and/or specification modifications were warranted due to site-specific conditions, <br />documentation was submitted to CC&V for DMG approval (see Appendix Q). No changes were <br />implemented without DMG approval. A summary of items that were addressed during construction <br />are summarized below as follows: <br />• April 2002: Golder accepted a variance in the Fine Shaft Backfill (FSB) <br />gradation for the specified quantity of material tested. The variance in the FSB <br />gradation was considered insignificant by Golder based on experience with <br />similar projects. <br />• August 2002: Golder accepted Leak Detection Fill (LDF) for the construction of <br />a section of the Leak Detection Trench (LDT) that was slightly more coarse than <br />the project specifications. <br />• October 2002: Ames installed a rock drain near the Phase IVb PSSA sump. The <br />trench and sump were constructed in accordance with the Certifying Engineer's <br />requirements. <br />• May 2003: Golder submitted a specification for Select Drain Cover Fill (SDCF) <br />for construction of the PSSA riser fill, <br />• May 2003: Golder approved removal of approximately 350 linear feet of 4-inch <br />• corrugated slotted HDPE Low Volume Solution Collection piping within the <br />southern portion of the PSSA sump area. <br />• June 2003: Golder approved substitution of 100-mil single-sided textured <br />geomembrane (textured side up) in place of 100-mil double-sided textured <br />geomembrane on a portion of the PSSA sump floor and in areas of double-sided <br />smooth . <br />• June 2003: Golder approved removal of the recessed depressions beneath the <br />PSSA riser base plates, whereby additional haunching of the High Volume <br />Solution Collection pipes is required. <br />• June 2003: Golder approved replacement of 26-inch HDPE pipe lengths entering <br />the Phase N PSSA sump with steel piping. <br />• June 2003: Golder approved the replacement of two 4-inch PCPE pipes in place <br />of each 6-inch PCPE pipe in the south west and south east risers. <br />1.5 Record Survey Documeutation <br />Ames Construction of Aurora, Colorado provided the Record Drawings for the activities associated <br />with the Phase IVb PSSA. A Colorado Registered Land Surveyor prepared the drawings. The Record <br />Drawings are presented in Appendix A. The Surveyor's certi£cates are presented in Appendix F, <br />Ames also provided locations for SLF density tests, SLF depth checks, geomembrane panels, and <br />I:\00@203\OJ00\FnICertP5SA0603\W3Ii03.M00A~3URep.J« Golder AssOCiOtes <br />