My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-07-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 1:19:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2003
Doc Name
Phase IV PSSA Area Cert Report
From
DMG
To
Cripple Creek & Victor Gold
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 24, 2003 -5- 003-2203.7 <br />technical issues and to review Golder activities. Golder staf£ng from the period of February 2001 <br />through August 29, 2002 is presented in the Final Report Cresson Pr~ecl Quality Assurance <br />Monitorinv, and Test Results Phase IVa Valley Leach Facility Completion. Teller County. CO (2002 <br />Phase Na Certification Report). Appendix C presents a summary of the Golder staff on-site during <br />the period of August 30, 2002 through June 2003. <br />Representatives of CC&V, Ames, Poly-Flex, and Golder conducted daily, weekly, and <br />preconstruction coordination meetings throughout the construction period. <br />1.3.1 Daily Construction Summary Re orts <br />Golder prepared daily construction summary reports as well as photographic documentation <br />(Appendix B) throughout the project to document the key elements of construction and the CQA <br />activities that occurred. On-site Golder CQA personnel, the Certifying Engineer and the Project <br />Engineers discussed construction activities on a regular basis. In addition, field personnel prepared <br />daily observation reports. Golder submitted these daily reports and a daily summary report to CC&V. <br />• Daily reports are not included in this report but were available for Colorado Division of Minerals and <br />Geology (DMG) review during the course of the project. <br />1.3.2 Weekly Construction Summary Reports <br />Golder prepared weekly construction summary reports which were submitted to CC&V and to the <br />DMG. Weekly Reports from the period of February 2001 through August 29, 2002 are presented in <br />the 2002 Phase Na Certification Report. The weekly reports during the period of August 30, 2002 <br />through June 24, 2003 (including Phase Nb and c construction activities) are presented in <br />Appendix D. <br />1.4 Project Specifications <br />All work was performed in accordance with the design plans and specifications in Amendment No. 8 <br />to Mining Permit M-1980-244 and subsequent revisions as approved by DMG. IFC Drawings are <br />presented in the Drawings section of this report and project specifications are presented in <br />Appendix E. <br /> <br />~:~oouzw~oaoa~niCenesseam~ao3szo3.aoo.o»uxepao~ Golder Associates <br />