workings. Bulkhead design and construction details will be addressed <br />through a Technical Revision to this Permit. In general, R is anticpated <br />that bulkhead construction considerations will incorporate the following: <br />Mount Rovale Adit Bulkheads: The Mount Royale No. 1 Adit (based on <br />conditions observed during the 2004 exploration program) has not been <br />noted to generate sign cant water as attributed to fracture system flow. <br />When present, the minor inflow has exhibited good water quality, and the <br />volume has been sufficiently bw such that it is capable of being managed <br />interior to the adR. However, since the Mount Royale No. 1 will intercept <br />the Cash Mine workings at the 3id level and the Cash Mine has been <br />known to produce water to approximately the 1~` level, Mount Royale <br />Ventures LLC anticipates a potential requirement for placement of a post- <br />mining bulkhead system inside the mine. The most likely location would <br />be proximal to the Cash Mine workings (i.e., the portal side of the <br />intersection of the Mount Royale No. 1 Adit and the 3id level workings). <br />Accordingly, underground trackage will be left in place to facilitate <br />movement of construction materials into this area. Ident~cation of the <br />speck bulkhead location and its engineering design will be addressed at <br />a later date (pre-closure, via a Technical Revision to the permit) when <br />there is sufficient knowledge of ground conditions to support an adequate <br />design. However, provision has been made for the cost of the bulkhead <br />and supporting engineering design within the reclamation cost estimate. <br />The estimated cost is based on similar installations in other mines. Once <br />the bulkhead is completed, underground trackage will be pulled and <br />salvaged. <br />The effectiveness of the bulkhead will be monitored for a period of one or <br />more years to determine if a secondary bulkhead is warranted. If so, <br />consideration will be given to construction of a secondary bulkhead <br />(between the previously constructed bulkhead and the portal) at a <br />location 'l00- to 200-feet in from the portal to contain the seasonal <br />groundwater inflows. A design and construction cost provision has also <br />been made for this secondary bulkhead in the recamation cost estimate. <br />The need for post-closure bulkheading at the (potential) Mount Royale <br />No. 2 Adit wilt also be determined following compiefion of the adif and <br />observation of long-term conditions during mining. If apost-closure <br />bulkhead is determined necessary, the bulkhead will be addressed <br />through a Technical Revision to the permit. Design of the bulkhead would <br />likely be generally consistent with that described above, subject to <br />variations introduced by geologic or other influencing conditions. <br />Since development of the Mount Royale No. 2 Adt remains uncertain at <br />this time, no cost provision has been made for the No. 2 Adit bulkheading <br />activities. It has been assumed that this will be addressed in a future <br />Technical Revision and bond re-calculation. More general portal area <br />reclamation activties are, however, incuded in the reclamation plan's <br />scope and cost estimate for the Mount Royale No. 2 Adit area. <br />Exhlblt D -Reclamation Plan r, <br />