Phase IVb Weekly Summarc No. 28 Paee 3 003-2303 <br />fusion and extnision seam peel and sheaz tests on remaining 80-mil single-sided textured geomembrane <br />deploy ed during this reporting period passed per project specifications. <br />Pole-Flex resumed and completed deployment of 100-mil smooth LLDPE seomembrane in the Phase <br />IVb OSA, southwest of the PSSA. Polvfle?: deployed 100-mil smooth LLDPE eeomembrane over an <br />area of approximatel}° 78?72 square feet in the Phase Nb OSA during this reponing period. <br />Geomembrarte panels B-614 through B-6~7 were deployed. seamed. and tested b~ Poh-flex. <br />Destructii~e fusion and extrusion samples DFb-178 through DFb-18~ and DXb-~9 through D.Xb=iO <br />were marked and removed. Destructive fusion and extrusion seam peel and shear tests on 100-mi] <br />smooth geomembrane deployed during this reporting period passed per project specifications. <br />A map of the azea worked during this repomng period is provided in Attachment C. <br />Phase IVc <br />_4mes did not perform any construction activities in the Phase IVc azea during this reporting period. <br />Field Monitorine and Testing Activities <br />Golder observed construction activities associated with Phase IV earthworks. All construction materials <br />and soil materials placed were verified as suitable_ and construction methods were in accordance oath <br />project specifications. <br />Galder observed placement, compaction. and moisty*e conditioning of SLF in the Phase IVb OSA <br />far subgrade preparation. thckness. compaction. moisture canteat. and materials. The Golder CQA <br />Earthworks monitor performed eight nuclear moisture-density tests (SLNb-200 through SLNb-207} <br />and performed three nuclear moisture-density retests on SLF that required reworking (SLNb-200a. <br />201a. and 206x) located within the Phase IVb OSA. The SLF met the requirements of the <br />specifications prior to deployment of geomembrane. Field test results are presented in Attachment <br />B. <br />Golder observed placement and compaction of BF in the Phase IVb OS_4. Golder CQA verified <br />minim'.tm thickness of 1 font for finish wade. and method compaction for finish and surface <br />acceptaz*tce_ as required. <br />Gai_der observed placement of secondary and tertia-v HVSCS pipi-tg in the Phase Ne OSA. <br />verifying ccnstruction and layout per the project plans. <br />Golder obsen~ed placement of the LVSCS riser piping and LVSCF into the 2H:1 V riser slope trench. <br />verifying constructian per the project plans. <br />Golder visually observed placement and grading of DCF in the Phase 1 Vb OSA. Golder CQA <br />monitors (one monitor per dater when dozers are greater than d0 fr apan) observed DCF placement <br />and verified minimum thickness of 2 feet for finish grade, 4 feet for FIVSCS primate pipe locations. <br />feet for 773 equipment. and 10 feet for haul road construction and equipment. <br />. ~a« nt _e;~m-v-.~~sso. ^oo: GOltler kSS6ClaY25 If~C. <br />