<br />Phase IVb W'eekh~ Summan No. 28 Pase? 00.-2?0~ <br />Ames resumed excavation of the Phase I~b OSA eeomembrane anchor trench on the Phase III ore <br />slope. excavatins approximateh 300 linear feet of anchor trench in preparation for eeomembrane <br />deploy~rtent. Ames also excavated approximateh 2~0 feet of anchor trench on the north side of Phase <br />IVb in preparation for geosynthetics deplo~~rrrent. <br />Ames backfilled approximately 300 linear feet of Phase I~'b OSA anchor trench on the Phase III ore <br />slope. <br />arses uncovered Drain Cover Fill (DCF) in areas damaeed by erosion over areas of previoush installed <br />~emembrane and at tie-in areas, where material had washed in from rainfall. <br />Ames placed. and compacted SLF materal into Lhe Phase TVb OSA on the sout<'t slope of Substation <br />Hill and dte south slope of Raven Hill (-west of the LOB). SLF material was worked. tested. and passed <br />per project specifications prior to SLF surface acceptance. <br />Ames continued placement of Hiatt Volume Solution Collection System (HVSCS) secondary and <br />tertiary piping within the Phase IVb OSA limits, followed by DCF haul and placement per project <br />specifications. Ames continued to haul and place DCF in the Phase Nb OSA, on the west and south- <br />facing slopes of Substation Hill and on the Phase IlI ore slope. <br />:9rrles continued production of DCF at the screen plant located near the Secondary Crusher. Antes also <br />continued limited production of SLF. <br />Ames installed the upper 200 feet of the 14-inch Lott' Volume Solution Collection Sysiem (T VSCS) <br />aser pipes in fire 2H.1 V riser *sench. P.mes fusion welded the upper pipe sections. and placed Low <br />Volume Solution Collection Fill (LVSCF) in the riser trench. <br />Poly-Flex resumed and completed deplo~rteni of 80-mil double-sided textured LLDPF ~eome.~,braae <br />in the Phase 1Vb OSA in the 2H:1V LVSCS riser trench above previously-placed LVSCF. Poly-Flex <br />deployed 80-mil double-sided tex2urcd LLDPE geomembrarte over an azea of approximately 4.627 <br />squae feet in the Phase IVb OSA during this reporting period. Geomembrane panels B-662 through B- <br />664 were deployed, seamed, and tested by Poly-Flex. Destructive extrusion seam sample D~'_b-41 wzc <br />marked and removed. Destructive extntsion seam creel and shear tests on D~'b-41 passed per proie;:t <br />SpeCIflCatlOnS. <br />Poh-Flex continued deplo«nent of 80-mil singles sided tex-itrred LLDPE geomembrane.in the Phase <br />i3%b OSA on the west-facins slope of Substation Hili. Poiv-Flex deployed 80-mil single-sided texnared <br />LLDPE aeomembrane over an area of approximately 36_?32 square feet in the Phase IVb OSA during <br />this reporting period. Geomembrane panels B-6d8 through B-661. and B-66S through B-674 were <br />deployed, seamed. and tested by Poly-Flex. Destructive fusion and extrusion seam samples DFb-i 57 <br />throuatt DFb-177. DFb-186 throuelt DFb-189_ and DXb-.~ through DXb-38 were marked and <br />removed. DFb-i57 failed to meet project specifrcation and additional destructive simples (DFb-1~7ai <br />and DF'o-1~Tb1) ~-ere taken across approximately ~1 linear f et ofrusion weld u.-ttil passing conditions <br />were met. The delineated failure across the seaming length was capped and extrusion welded. The <br />results of testing on destructive fusion samples DFb-] 86 through DFb-189 are pending. Destructive <br />a,E,. n-o _e;m.---.,~_s,. =ou; Golder .9ssociates Inc. <br />