My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-08-25_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-08-25_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 1:07:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/25/2003
Doc Name
Weekly Const. Report
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~i. <br />i[1l~ <br />Auutst 14. 2003 <br />vtr. Ron Roberts <br />Cripple Creek & V ictor Gold Mining Company <br />P.O. Boa 191 <br />2755 S*ate Highway 67 <br />Victor. CO 80860 <br />GOlder Associates Inc. <br />44 IInion Boulevard. Suite 300 <br />Lakewood. CO 80238 <br />(303) 980-040 <br />(303) 98~-3080 <br />Golder Project'vo.: 003-2203 <br />RE: Summary No. 28: 3uly 27 through August 9, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project dw-ing the period of July 27 <br />thro~h August 9.2003. <br />The weather during this reporting period was clear to cloud~~. Approximate da}nime low <br />temperatures ranged from 44° F to »° F, and highs ranged from 70° F to 87° F. Weather <br />observations were made on twelve da}~s of this fourteen-day reporting period- <br />Construction Svnoosis <br />Antes Construction In:. ;Ames) of P,urora. Colorado is dle earthworks contractor for the Phase ty- o <br />COnsLrltCtlon. :~~'neS COIlT1Cted Phase Itib COnStrl2Ct?On act: vltle5 OP. ?vde1V-_° da_~'S Ot LRtS fO~~TT.een-~^~.~ <br />reporui~g penod (July 28 Through Aagti_st 2 and August 4 trough Au,u;. 9; Poh=Flex conducted <br />Phase IVb construction activities on twelve days of this fourteen-day reporting penod (July 28 through <br />August i and Aur2st 4th ou ~ A»~ust 9). <br />Phase I~ b <br />Ames resumed re-contounna and compaction of suberade Structural Fill (SF) in preparation for Soil <br />Liner Fill (SLF) placement in the Phase IVb OSA on the south facing slopes of Raven Fliil, aordt ofte <br />PSS A. Arses also o mpacted lie Pha.>e III ore slope i. preparation fo: Bedd-:ng Fill (BF) placement. <br />Ames hauled and placed BF material into the Phase IVb OSA on the Phase III ore slope adjacent to the <br />PSSA west end berm and eastward in pre anal on for g~omembrane d plo~~ent. <br />