My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-08-25_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-08-25_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:50 PM
Creation date
11/21/2007 1:07:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/25/2003
Doc Name
Weekly Const. Report
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 1Vb Weekh Summary No. 28 Paee 4 003-2203 <br />Golder visualh~ observed removal of DCF from the Phase IVb / Phase I /Phase II tie-in area. at the <br />old LOB pad access haul road. Golder marked damage caused to the seomembrane for subsequent <br />repair during Phase IVb geomembrane tie-in construction. <br />Golder observed anchor trench excavation in the Phase IVb OSA for proper location and dimension <br />(2` wide by 3` deep). Anchor trench excavation met or exceeded the requirements of the <br />specifications. Golder also provided part-time observation for anchor trench backfilling. verifying <br />construction per project plans. <br />Golder observed eeomembrarte deployment and repairs. documenting ambient air temperature. panel <br />dimensions. thickness. seaming, tie-in overlap, and seam testing (trial seams. pressure. vacuum. and <br />destructive). Geomembrane placed in the Phase IVb OSA met project specifications. <br />Laboratory Tests <br />Golder obtained QA samples of Low Volume Solution Collection Fill (LVSCFb-14). Drain Cover <br />Fill (DCFb-I3 and DCFb-14}, and Soil Liner Fill (SLFb-20}. Laboratory index testing was <br />conducted on samples of Drain Cover Fill (DCFb-li and DCFb-14). and Soil Liner Fill (SLFb-20) <br />to verify suitability of materials used. Laboratory test results are presented in Attachment B. <br />Meetines <br />CC&V held Weekly Contractors' meetings on July 29 and August 5, 2003. Items discussed <br />included Safety. Environmental. Schedule. and CQ.A. The next weekly meeting roll he held on <br />August 12. 2003 at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this repotting period is presented in <br />Attachment A. <br />Sincerely. <br />~~~~ <br />Ron DiDonato <br />Project Resident <br />vn,:~ nt _s mi,~_v-a,,,,,aa. ~ooz Golder Associates lnc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.