My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE31344
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE31344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:00 PM
Creation date
11/21/2007 12:57:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
5/20/1993
Doc Name
BATTLE MOUNTAIN RESOURCES INC SAN LUIS DMG PN M-88-112 3RD PARTY INDEPENDENT SAMPLING REVISED MEMO
From
DMG
To
BATTLE MOUNTAIN GOLD CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • i <br />2. The monitoring locations for each third party sampling event shall be <br />designated by DMG in advance of the sampling event and shall be <br />selected from the following approved monitoring locations: <br />a. Groundwater Monitoring Wells M-6, M-7, M-8I M-9, M-12, <br />M-13. <br />b. Surface Water Monitoring Site RS-5. <br />c. The Lower and Upper Tailings Ponds and the Collection Pond. <br />3. In the event that DMG determines on the basis of third party sampling <br />that monitoring data obtained from the tailings facili by BMRI are <br />inaccurate or unreliable, DMG may direct the third arty sampling <br />contractor to conduct additional independent sampling nd subsequent <br />sample analysis in accordance with the requirements o this MOU, at <br />the sole discretion of the DMG provided that such wo,k is within the <br />work description and budget set forth in the scope of wprk attached to <br />the Contract. In the event that such work is not w~thin the work <br />description and budget set forth in the scope of work, t en DMG may <br />propose a change order to the Contract. <br />B. Direction of Sampling Activity <br />1. The DMG, through its project manager, shall direct th~ sampling and <br />analytical efforts of the third parry sampling contracto . <br />2. BMRI shall provide the DMG project manager a s hedule of its <br />anticipated sampling activities which the DMG project manager shall <br />direct the third party sampling contractor to follow to the maximum <br />extent possible so that unnecessary redundant and dupli alive sampling <br />is avoided. <br />The DMG shall provide BMRI a minimum of five (5 working days <br />notice to coordinate the sampling activity with its sam~ling personnel <br />or contractor. <br />4. In an effort to facilitate coordination and safe working c nditions, third <br />party sampling contractor shall report to BMRI personn 1 immediately <br />upon arrival at the minesite and shall remain under t e direction of <br />BMRI during the course of performing the sampling a tivity required <br />hereunder. <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.