My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE31344
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE31344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:00 PM
Creation date
11/21/2007 12:57:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
5/20/1993
Doc Name
BATTLE MOUNTAIN RESOURCES INC SAN LUIS DMG PN M-88-112 3RD PARTY INDEPENDENT SAMPLING REVISED MEMO
From
DMG
To
BATTLE MOUNTAIN GOLD CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />a detailed scope of work setting forth the frequency, local~tions, analytical <br />parameters and procedures to be utilized in conducting the sampling and <br />analyses hereunder; <br />2. Pay the third party sampling contractor pursuant to the terms) specified in the <br />Contract; and <br />3. Upon proper notice as specified hereunder, provide access t sts facilities to <br />the third party sampling contractor for the purpose of cond cling sampling <br />activities required hereunder. Nothing herein otherwise i linuts BMRI's <br />authority to restrict access to its facilities. <br />IV. OBLIGATIONS OF DMG <br />Under the terms of this MOU, DMG shall: <br />1. Select, with the concurrence of BMRI, the third party samplin contractor and <br />independent laboratory to be used to analyze the samples ~btained in the <br />third party sampling program contemplated hereunder. <br />2. Direct the sampling and analytical activities of the third arty sampling <br />contractor retained by BMRI pursuant to the Contract and the requirements <br />of this MOU; <br />3. Receive and review data and reports received from the third (party sampling <br />contractor and provide copies of all such materials to BMRI;! and <br />4. Receive and review invoices issued by third party sampling 'contractor and <br />transmit comments to BMRI. <br />V. ADMINISTRATION OF THIRD PARTY SAMPLE COLLECTION <br />A. Sampling Location and Frequency <br />1. Independent sampling, and subsequent sample analysi conducted by <br />an analytical laboratory retained by the third party samp~ing contractor, <br />shall be conducted at DMG's direction once during the first three <br />calendar months following final approval of the TR N .006 protocol <br />and the execution of the Contract, twice prior to April 30, 1993 and <br />twice during each of the subsequent two (2) three (3) -~onth periods, <br />which commence on May 1, 1993. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.