My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE31291
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE31291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:42:58 PM
Creation date
11/21/2007 12:56:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Enforcement
Doc Date
9/8/1994
Doc Name
KERR COAL CO
To
GOVERNOR OF COLO
Violation No.
TD1994020352002TV1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENT BY~Xerox Telecopier 7021: 9- 8-84 : 3~25P11 : <br />Honorable Roy Romar <br />September 8, 1994 <br />Page 6 <br />3038323804+ 303 832 8106:ii 7 <br />D~3Q~~ <br />permits which the DMG had renewed in recent months. Ken's permit was renewed on <br />December 9, 1992. OSM'e spent a week at the DMG's off ce reviewing these permit <br />files for procedural and substantive deficiencies. The only deficiencies which the <br />resulting OSM report noted is Ken's pcaait concerned whether all of the aquifers in the <br />vicinity of the Mine had been identified sad analyzed by the DMG in the groundwater <br />hydrology section. There was no mention of pmblems regarding compliance with the <br />AOC standard or whether the backfilling and grading plan, as revised in 1990, met that <br />standard. <br />2. 'The DMG notified OSM's AFO that Kerr began the backfilling and <br />grading work in Juae,1993 snd of Kerr'a progress through January, <br />1994 by monthly inspection reports. <br />The Summary states that the AFO's inspectors expected the baclil'illing and <br />grading work to take up to nine years sad that they did not press the AOC issue because <br />they were unaware Kerr had begun the work. At the time of the April, 1993 inspection, <br />the 1990 approved plan did allow several years to complete backfilling and grading. <br />Thereafter Kar was able to aaange the equipment, work force and fineacirtg to do the <br />complete job. Work began is Juae, 1993. <br />
The URL can be used to link to this page
Your browser does not support the video tag.