Laserfiche WebLink
SENT BY~Xerox Telecopier 7021 : 8- 9-84 3~25PN : <br />Honorable Roy Romer <br />September 8, 1994 <br />Page 7 <br />~~Q ~ p <br />Mr. Price inspected the mine monthly and Lis inspection reports describe the <br />beginning end progress of the project. For instance, the report of his inspection on <br />May 13, 1993 states: <br />ICetr Coal was planning to increase backfilli~ng volumes <br />considerably above committed in amounts and was hoping to <br />complete backfilling this year. This would be much ahead of <br />the committed to schedde. <br />His June 8 inspection report states: <br />The mine is mobilizing to start full reclamation of the mine. <br />About 8 scrapers will be working to compete [sin] the <br />reclamation by nc~ summer. George Patterson estimated that <br />it would take 8 continuous months to complete baakfilling <br />and grading.... A scraper ramp was being constructed. <br />His July 22 inspection repa~rt states: <br />$ackfilling and grading of tho 720 [pit] and pit 1 are in fall <br />swing.... At pit 1 highwall reduction has begun. <br />3039323804+ 303 632 9106: 8 <br />ou,~, war <br />