Laserfiche WebLink
PHASE IV <br />ITEM DESCRIPTION UNIT QUAN. UNIT TOTAL <br /> PRICE <br /> <br />1 <br />Mobdizatwn <45 mi <br />1 LS _ <br />_ <br />5 2,000.00 <br />2 Grading and Stopmg <br />-- CY <br />~ 11.300 <br />- 1 <br />S 2.00 1 22.600.00 <br />3 `Place Top Sod CY 27,910 1.50 41.865 00 <br /> Seed, Mulch. Tack, 8 Fertilize f <br />4 <br />Pit Floor (TYPE 'A) __ AC <br />_ 18 125.00 2.00 00 <br /> Seed, Mulch, Tack, 8 Fertilize <br />5 <br />Side Slopes (TYPE '8") AC 1 420 00 420 00 <br /> Subtotal ~ 566.887 00 <br /> <br />6 Indirect Costs LS 2,000.00 <br /> Subtotal 68,887 OD <br />7 Protect Management LS 4 690 00 <br /> TOTAL PHASE IV 73,567.00 <br /> PHASE V <br />REM DESCRIPTION UNIT pUAN. I UNIT ~ TOTAL <br /> _ _ PRICE <br />1 Mobdizat~on <45 m+ LS $ 2.000 00 <br /> 1 ~ <br />2 Grading and Sloping <br />- -- CY 10.595 5 2.00 <br /> <br />+ 21,190 00 <br />3 I Place Top Sod CY 22.900 1.50 34,350 00 <br /> _ <br />Seed. Mulch, Tack, 8 Fertl¢e <br />4 <br />Pd Floor (TYPE "A') AC 19 125.00 2.375.00 <br />5 ~ Seed. Mulch, Tack. 8 Fertilize ~ AC 2 420 <br />00 84 <br />00 <br />. Side Slopes (TYPE "B") . <br />~ 0 <br /> Subtotal S60 755 00 <br />6 Indirect Costs LS 1.825 00 <br />f Subtotal 62,600 OD <br />7 Protect Management LS 4,250.00 <br /> TOTAL PHASE V 66,850.00 <br />ReV os~+a~o~ <br />