Laserfiche WebLink
PHASE II <br />ITEM DESCRIPTION UNIT OUAN. UNR TOTAL <br /> l __ PRICE _ <br />1 I <br />Mobd¢atron <45 mi LS $ 2.000.00 <br />2 'Grading and Sloping CY 2,500 $ 200 5.000 00 <br />3 ~ Place Top Shc CY 17,940 1.50 ~ 26,910.00 <br /> Seed. Mulch, Tack, & Fertilize ' <br />4 <br />Pit Floor (TYPE'A_~_ AC 14 125.00 ! 1.750.00 <br /> <br />Seed. Mulch. Tack. & Fertilize _ <br />5 <br />. Side Slopes.- tNPE "B") AC 2 420.00 840 00 <br /> Subtotal S36,500 00 <br />6 l Indirect Costs LS ~ 1,095 00 <br /> Subtotal 1 37, 595 00 <br />7 1 Project Management ~ LS `_ 2,555 00 <br /> TOTAL PHASE II 40,150.00 <br /> PHASE III <br />ITEM DESCRIPTION UNIT OUAN. UNIT TOTAL <br /> PRICE _ _ <br />~ _ <br />1 ~ Mobd¢abon <45 mi LS S 2,000.00 <br />2 Grading and Sloping 1 CY 19,970 ~ $ 200 49,925.00 <br />3 Place Top Soil CY 20,110 1.50 i 30,165.00 <br /> Seed, Mulch, Tack. 8 Fertilize <br />4 <br />Pit Floor (TYPE 'A'j__ AC 14 125.00 ~ 1,750 00 <br /> <br />~ <br />Seed Mulch, Tack. 8 Fertilze _ <br />5 <br />. <br />Sbe Slopes (TYPE "B' AC 2 420.00 I 840 00 <br /> Subtotal - <br />~ $84,680 00 <br />6 . Indtrect Costs LS 2.140 00 <br />~ Subtotal 87.220 00 <br /> <br />7 , Protect Management ~ LS i 5.930 00 <br /> TOTAL PHASE III ~ 93,i5U 00 <br />