Laserfiche WebLink
PHASE VI <br />ITEM DESCRIPTION UNIT OUAN. UNIT TOTAL <br />_ _ PRICE <br />t Mobdizatan <45 m. LS _ I $ 2,000.00 <br />2 . Grading and Sloping CY 24,830 ~ S 2 00 49,600 00 <br />3 Place Top Sorl CY 23,130 1.50 34,695 00 <br />4 ` Seed, Mulch, Tack, & Ferblize <br />" <br />" AC 18 125.00 2.250.00 <br />_ PA Floor (TYPE <br />A <br />) __ __ <br />5 Seed, Mulch. Tack 8 Fertilize <br />" AC 3 420.00 1 <br />260 OO <br />. Side Slopes (TYPE 'B <br />)_ , , <br /> Subtotal 589.805 00 <br />6 j Indirect Costs LS 2.695.00 <br /> Subtotal 92.500 00 <br />7 Protect Management LS 6.285 00 <br /> TOTAL PHASE VI 98.785.00 <br /> PHASE VII <br />REM DESCRIPTION UNIT QUAN. UNIT <br />PRICE TOTAL <br />1 ~ Mobd¢atan <45 mr LS $ 2.000.00 <br />2 I Grading and Sloping CY 0 $ 2.00 0.00 <br />3 Place Top Sod CY 7,350 1.50 11.205.00 <br />4 Seed. Mulch. Tack. 8 Fertile <br />' AC 7 125.00 875,00 <br /> Pit Floor (TYPE <br />A) _ _ <br />5 Seed, Mulch, Tack. 8 Fertilize <br />" <br />" AC 0 420.00 0.00 <br /> Side Slopes TYPE <br />B <br />) <br /> Subtotal $14.080.00 <br />6 Indirect Costs LS 425 00 <br /> Subtotal to 505 00 <br />7 Pro)ect Management I LS <br />• <br />- ~ <br />- -• 985 00 <br />- <br /> TOTAL PHASE II 15,490.00 <br />TOTAL ALL PHASES = 5639,837.00 <br />Rev OB/10!03 <br />