Laserfiche WebLink
CIRCES Cost Estimatino Software <br />Task # : 004 <br />pate : 09!16/2004 <br />User : ESC <br />State :Colorado <br />Couniy :Latimer <br />Site :Roberts Quarry <br />Agency or organization name : DMG <br />Permit or other job action :TR-04 <br />Task description :Rep/~ <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 20.167 <br />in Section 27 <br />PermiUjot# :M-1977-301 <br />Abbreviation :none <br />Filename :M301-004 <br />from Pile A <br />Basic machine :CatOfOR-10SU Horsepower: 570 <br />Blade type :Semi-Universal <br />Attachment no.1 :ROPS Cah Shift basis : 1 perday <br />Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />OwnershipcosUhour : $70.34 NA <br />OperatingcosUhour : $128.75 100 <br />Ripper op.cost/hour : $0.00 0 <br />Operator cosVhour : $31.83 NA <br />Total unit cosUhour : $230.93 Total fleet cost/hour : x461.86 <br />Swell <br />LCY factor <br />Source of estimated volume :10" <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Average push distance : 250 feet <br />Unadjusted hourly production : 754.3 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 20.00 h (I <br />Average site altitude : 6,000 feet <br />Material weight : 2,100 Ibs/LCY <br />Weight description <br />Earth -Loam <br />Fleet size : 2 Dozers) <br />Unit cost : $1.031 /LCY <br />Loose <br />NA volume : 20,187 LCY <br /> <br />Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.00 (Cat HB <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1shiff/da <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 0.54 (Cat HB <br />Altitude : 1.00 (Cat HB <br />Matedal weight : 1.10 (Cat HB <br />Blade type : 1.00 (S/SU/L <br />Net correction : 0.30 <br /> <br />Adjusted unit production : 224.06 LCY/hr <br />Adjusted fleet production : 448.11 LCYlhr <br />Total job time : 45.00 Hours <br />Total job cost : x20,788 <br />