My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-09-16_REVISION - M1977301
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977301
>
2004-09-16_REVISION - M1977301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:17 PM
Creation date
11/21/2007 12:31:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977301
IBM Index Class Name
Revision
Doc Date
9/16/2004
Doc Name
Reclamation Cost Estimate
From
DMG
To
Pete Lien & Sons Inc
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimatinst Software <br />Agency or organization name :OMG <br />Task # : 005 State :Colorado <br />Date : 09/16/2004 County :Lorimer <br />User: ESC Site :Roberts( <br />PermiVOb#:M-1977-301 <br />Abbreviation :none <br />Filename : M301-005 <br />Permit or other job action : TR-04 <br />Task description :Replace Topsoil to Phase 11 <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Tmck/loader team -Truck : Cat 773D <br />-Loader :CAT 990 Sedes 11 <br />Support equipment -Load area :NA <br />-Dump area : Cat D10R - 10SU <br />Road maintenance -Motor grader. CAT 16H <br />-Water Wck :Water Tanker. 5.000 Gal. <br />Cost Breakdown : ruck/LOader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Gmder Water Tmck <br />Import data filename : truck2 loader NA dozer grader misctmk <br />U8lization-machine : 100 86 NA 100 25 25 <br />-Flipper attachment : NA NA NA 0 0 NA <br />Ownership cosVhour: $61.45 $79.84 NA $70.34 $54.00 $23.75 <br />Operafing cesUhour: $73.78 $84.06 NA $128.75 $14.58 $9.18 <br />Ripper op. cost/hour : NA NA NA $0.00 $0.00 $0.00 <br />Operetorcostlhour: $25.24 $32.02 NA $31.83 $32.21 $24.14 <br />Unit subtotals : $180.45 $195.93 NA $230.93 $100.80 $57.05 <br />Number of units : 2 1 0 1 1 1 <br />Group subtotals : Work : $516.82 Support : $230.93 Maintenance : $157.85 <br />Total work team cosUhour : $905.61 <br />Initial Swell Loose <br />volume: 21,511 LCY factor: NA volume: 21,511 LCY <br />Material weight <br />Descr.: Earth -loam <br />Rated payload <br />Payload cepaaty <br />Loadin To ICa c <br />Rated capacty (nom. heaped) <br />Descr.:Loose material- f"end <br />Bucket fill factor: <br />Adjusted bucket capacity <br />100 <br />Heaped volume <br />108,060 pounds Average volume <br />51.46 LCY Adjusted volume^. <br />Final Wck volume based on number of loader passes <br />Wck volume atljustetl to nol exceed rated payload or heaped wluma <br />LCY <br />9,843 LCY <br /> Truck <br />Altitude adj.: 1.000 <br />Job efficiency : 0.830 <br />Net conec8on : 0.830 <br />34.80 L(:Y <br />48.40 LCY <br />40.60 LCY <br />46.40 LCY <br />39.38 LCY <br />Site altitude (H.) : t <br />Loader S <br />1.000 (C <br />0.830 ~(i sl <br />0.830 ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.