Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 003 <br />Date : 09/16/2004 <br />User : ESC <br />State :Colorado Permit/job# : M-1977-301 <br />County :Lartmer Abbreviation :none <br />Site :Roberts Quarry Filename :M301-003 <br />Agency or organization name :DMG <br />Permit or other job action : TR-04 <br />Task description :Grade Phase ii Area <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $70.34 NA <br />Operagngcost/hour: $128.75 100 <br />Ripper op. cosUhour : $2.77 20 <br />Operator cosf/hour : $31.83 NA <br />Total unit cost/hour : $233.70 Total Fleet cosUhour : ,$487.41 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 50,000 LCY factor : NA volume : 50,000 LCY <br /> <br />Source of estimated volume :DMG Estimate <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Average push distance : Z00 feet <br />Unadjusted hourly production : 946.0 LCY/hr <br />Matedal consistency description <br />Compacted fill or embankment <br />Average push gradient : 10.00 % (~ <br />Average site altitude : 6,D00 feet <br />Material weight : 3,300 Ibs/LCY <br />Weight description <br />Decomposed rock - 75% Rock, 25% Earth <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 1.22 <br />Altitude : 1.00 <br />Material weight : 0.70 <br />Blade type : 1.00 <br />Net correction : 0.33 <br />Adjusted unit production <br />Adjusted fleet production <br />J08 TIME AND COST <br />Fleet size : 2 Dozers) Total job time <br />Unit cost : $0.738 /LCY Total job cost <br />Source <br />316.75 LCY/hr <br />633.51 LCYIhr <br />78.93 Hours <br />