Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task#: 002 State :Colorado PermiUjob#:M-1977-301 <br />Date : 09/16/2004 Counly :Lorimer Abbreviation :none <br />User : ESC <br /> Site :Roberts Quarry Filename :M301-002 <br />Agency or organization name :DMG <br />Permit or other job action :TR-04 <br />Task descrption <br />_ <br />, Final Grade Stockpile D to 3h:1 v slopes <br />. <br />....:: <br />HOURLY EQUIPMENT COST _:. <br /> <br />"' <br /> Basic machine : Cat D10R - 10SU Horsepower : 570 <br /> 81ade type : Seml-Universal <br /> Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br /> Attachment no. 2 ; 1-shank dpper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $70.34 Nq <br /> OperatingcosUhour: $128.75 100 <br /> Ripper op.cosUhour: $2,77 20 <br /> Operator cosUhour: $31.83 NA <br /> Total umt cost/hour $233.70 Total fleet cosUhour : $233.70 <br />MATERIAL QUANTITIES "' - <br />Initial Swell Loose <br />volume: 10,000 LCY factor: NA volume: 10,000 LCY <br />Source of estima ted volume :DMG Estimate <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 0.80 (Cat HB) <br />Unadjusted hourly production : 946.0 LCY/hr Dozing method : 1.00 (gap,) <br /> <br />Material consistency description : Visibility : 1.00 (avg.) <br /> <br />Rock, well ripped or blasted Job efficiency : 0.83 (1 shiff/day) <br /> Spoil pile : 0.70 (fnd-mn <br /> Push gradient : 1.33 (Cat HB) <br />Average push gradient : 15.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.70 (Cat HB) <br /> Biade type : 1.00 (S/SU/U) <br />Material weight : 3,300 Ibs/LCY Net correction : 0.32 <br />Weight description <br />Decomposed rock - 75% Rock, 25% Earth Adjusted unit production : 305 <br />36 LC <br /> . <br />Y/hr <br /> Adjusted Fleet production : 305.36 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.765 /LCY <br />Total job fime : 32.75 Hours <br />Total job cost : 57.653 <br />