My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-09-16_REVISION - M1977301
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977301
>
2004-09-16_REVISION - M1977301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:17 PM
Creation date
11/21/2007 12:31:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977301
IBM Index Class Name
Revision
Doc Date
9/16/2004
Doc Name
Reclamation Cost Estimate
From
DMG
To
Pete Lien & Sons Inc
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatin Software <br />................... <br />PROJECT IDENTIFICATION <br />Task # : 007 <br />Date : 09/16/2004 <br />User: ESC <br />State :Colorado <br />County :Ladmer <br />Site :Roberts Quarry <br />Agency or organization name :DMG <br />Permit or other job action :TR-04 <br />Task description :Rip Roads <br />Selected estimating method : Aiea <br />Basic machine :Cat D10R - fOSU Horsepower: 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :1-shank ripper <br />MATERIAL UANTITIES <br />Altemate methods - <br />Seismic : NA <br />Area : 3.00 <br />Permit/job # :M-1977-301 <br />Abbreviation :none <br />Filename :M301-007 <br />NA load factor : NA <br />acres Rip depth (ft) : 3.00 <br />Source of estimated quantity :DMG Estimate <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Altemate methods - <br />Seismic : Seismic velocity : NA feet/second <br />Unadjusted production : NA cu. yds./hour <br />Area : Avg. ripping depth : 1.50 feet/pass <br />Average ripping width : 6.74 feeUpass <br />Avorage ripping length : 50.00 feet/pass <br />Average dozerspeed: 88.00 feet/minute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.567 acres/hour <br />Unadjusted production : 1,372.96 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 2 dozers) <br />Unit cost : $0.214 per cu. yd. <br />Bank volume : NA BCY <br />Volume : 14,520 BCY or CCY <br />Unadjusted production <br />per selected method : 1,372.96 cu. yds./hour <br />Site altitude : 6,000 feet <br />Altitude adjustment: 1.00 (Cat H8) <br />Job efficiency factor : 0.83 (1 shlff/dayJ <br />Net job cortection : 0.83 multiplier <br /> <br />Adjusted unit production : 1,139.56 cu. yds./hour <br />Adjusted fleet production : 2,279.12 cu. yds./hour <br />Total job time : 6,37 hours <br />Total job cost : 53,101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.