My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-09-16_REVISION - M1977301
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977301
>
2004-09-16_REVISION - M1977301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:17 PM
Creation date
11/21/2007 12:31:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977301
IBM Index Class Name
Revision
Doc Date
9/16/2004
Doc Name
Reclamation Cost Estimate
From
DMG
To
Pete Lien & Sons Inc
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 008 <br />Date : 09/16/2004 <br />User: ESC <br />State :Colorado <br />County :Lorimer <br />Site :Roberts Quarry <br />Agency or organization name :DMG <br />Permit or other job action : TR-04 <br />Task description :Grade Roads <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat DSR Series 1l - 8SU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $50.90 NA <br /> Operatingcost/hour: $69.48 100 <br /> Ripper op.cost/hour: $1.00 10 <br /> Operator cosUhour : $31.83 NA <br /> Total unit cosUhour : $153.21 Total fleet cost/hour : $153.21 <br /> <br />MATERIAL QUANTITIES ,:: , <br />Initial Swell Loose <br />volume: 10,700 LCY factor: NA volume: 10,700 LCY <br /> <br />Source of estimated volume :DMG Estimate <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.80 (Cat HB) <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shiff/day) <br />Hard to ddit Spoil pile : 0.70 ((nd-mf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.70 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,300 Ibs/LCY Net con-ection : 0.24 <br />Weight description <br />Decomposed rock - 75% Rock, 25% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.994 /LCY <br />Adjusted unit production : 154.06 LCY/hr <br />Adjusted fleet production : 154.08 LCY/hr <br />Total job time : 89.48 Hours <br />Total job cost : $10,841 <br />Permit/job# :M-1977-301 <br />Abbreviation :none <br />Filename : M301-008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.