My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-09-16_REVISION - M1977301
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977301
>
2004-09-16_REVISION - M1977301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:17 PM
Creation date
11/21/2007 12:31:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977301
IBM Index Class Name
Revision
Doc Date
9/16/2004
Doc Name
Reclamation Cost Estimate
From
DMG
To
Pete Lien & Sons Inc
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinu Software <br />Task # : 006 <br />Date : 09/16/2004 <br />User : ESC <br />State :Colorado <br />County :Lorimer <br />Site :Roberts Quarry <br />Agency or organization name : DMG <br />Permit or other job action : TR-04 <br />Task descdption :Repl+ <br />HOURLY EQUIPMENT COST <br />on Stockpile D area <br /> Basic machine :Cat D10R - IOSU Horsepower : 570 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $70.34 NA <br /> Operating cosUhour : $128.75 100 <br /> Ripper op.cosUhour : $0.00 0 <br /> Operator cosUhour : $31.83 NA <br /> Total unit cosUhour : $23b.93 Total fleet cosUhour : $230.93 <br />MATERIAL QUANTITIES ~ ~ ` <br />Initial Swell Loose <br />volume : 5,000 LCY factor : NA volume : 5,000 LCY <br /> <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION r <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 400 feet Material consistency : 1.00 (Cat Hl3) <br />Unadjusted hourly production : 497.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency descdption : Job efficiency : 0.83 (1 shift/day) <br />Consolidated stockpile Spoil pile : 0.70 (fnd-mf) <br /> Push gradient : 0.79 (Cat HB) <br />Average push gradient : 10.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 1.10 (Cat Hf3) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,100 Ibs/LCY Net correction : 0.38 <br />Weight description <br />Earth -Loam Adjusted unit production : 186.66 LCY/hr <br /> Adjusted fleet production : 188.66 LCY/hr <br /> <br />JOB TIME AND COST ,. <br />Fleet size : 1 Dozers) Total job time : 26.79 Hours <br />Unit wst : $1.237 /LCY Total job cost : $6,186 <br />PermiUjob# :M-1977-301 <br />Abbreviation :none <br />Filename :M301-006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.