Laserfiche WebLink
The seed mix to establish the wetland azea is given below: <br />Species Variety PLS/Acre <br />Slender Wheatgrass 3.0 <br />Timothy 2.0 <br />Redtop Grass 1.0 <br />Cazex sedge 1.2 <br />Common Reedgrass 0.5 <br />Canadian Reedgrass 0.5 <br /> <br />Total PLS per Acre 8.2 <br />Map F shows all the final contows and reclamation azeas planned for the site. Map C-3 shows the <br />cross-sections of the reclaimed terrain in comparison with the original terrain. It is seen from this <br />map that the restored land is lower due to the gravel extraction but is more than adequate to achieve <br />the post-mining land use. <br />The landowners desire that the access road to La Salle Road and to Western Gravel's property <br />across the River remain after reclamation <br />2. Reclamation Timetable <br />The Phase 1 azea can be re-topsoiled when Phase 2 is being mined, but the majority of the <br />reclamation will be done at the end of the reserve life, which is expected to be in 10 to 15 years <br />after 2005. <br />North R-34 Pit 1107 <br />14 <br />