Laserfiche WebLink
(iii)The sequence of the mine phasing is denoted on the mining plan <br />with directional arrows. Please refer to (Exhibit D), Mining Plan, <br />which shows the sequence for each phase of the mining <br />operation. <br />(f) (i) The nature of the deposit to be mined includes primarily gravel for <br />road base. The thickness of the deposit is approximately 18 feet deep. <br />The overburden to be removed is approximately 2 feet thick and is <br />proposed to be stockpiled in the area outlined on the Mining Map (Exhibit <br />(ii) Please refer to (Exhibit I) for specific soils information. <br />(g) The primary material to be excavated from this mine is gravel, Class 5, and pipe <br />bedding material. The secondary material will be dirt and fill dirt. <br />(h) The intended use of mined material is for road base, pipe bedding material and fill <br />dirt. <br />(i) No explosives are proposed for the mining or reclamation phases of this operation. <br />RECEIVED <br />OCT 19 2004 <br />Division of Minerals and Geology <br />