My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-19_REVISION - M1994096
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994096
>
2004-10-19_REVISION - M1994096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:39 PM
Creation date
11/21/2007 12:28:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994096
IBM Index Class Name
Revision
Doc Date
10/19/2004
Doc Name
CN-01 Application and Receipt of Correct Appl and Missing Exhibits
From
High Plains Sand and Gravel LLC
To
DMG
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEI~A?~~ <br />OCT 19 2004 <br />EXHIBIT D <br />MINING PLAN 9iuisioaofMineralsancu~c,,:„r <br />The High Plains Gravel Mine is proposing to excavate approximately 49 acres of land <br />located north of Wellington. Please see Exhibit A for a Vicinity Map showing the <br />location of the mining operation. An existing 12.98 acres of land has already been mined <br />or is in the process of being mined. The next phase of mining is scheduled to commence <br />upon approval of the 112 Permit. The 49 acres of land can be separated into 6 different <br />areas. These areas are listed as follows: <br />• Previously mined pit: 6.98 acres <br />• Existing gravel pit: 6 acres <br />• Phase 1: 10 acres <br />• Phase 2: 10 acres <br />• Phase 3: 10 acres <br />• Existing family residence and out buildings: 4.39 acres <br />• Residual land remaining: 1.12 acres <br />(a) Mining for the next phase of work will commence upon approval of this <br />permit application. Work for each phase of work is estimated to last 10 <br />years for each phase. <br />(b) Standard earthmoving equipment will be utilized for grading and <br />contouring of the mine slopes. Slopes are proposed to be a maximum 3: <br />gradient for side slopes. <br />(c) It is not anticipated that there will be any water encountered during the <br />mining process. Therefore no water diversions or impoundments are <br />proposed for this project. <br />(d) Each mining phase will be10 acres in size. <br />(e) (i) Mining for each phase is proposed to last approximately 10 years. <br />It is anticipated that reclamation work will commence upon the <br />completion of each phase of work. Therefore, when one phase is <br />completed, it will be reclaimed before starting the next phase of work. <br />(ii) Please refer to (Exhibit D), Mining Plan, for size of specific mining <br />phases. <br />
The URL can be used to link to this page
Your browser does not support the video tag.