Doc Name
CORRECTIVE ACTIONS ON SNYDER QUARRY ROAD & WILLIAMS CANYON ROCK SPILLS
From
MARK A HEIFNER
To
MLR
Violation No.
MV1989015
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 2 <br />October 5, 1989 <br />Schedule for corrective actions <br />Snyder Quarry <br />Fred Banta <br />b: It is felt that the culverts should be installed <br />after the grading work on the major disturbances is <br />completed so the culverts in and near those work areas coin <br />be properly set and aligned with any alterations in <br />topography resulting from the regrading of the major <br />disturbances. No work can be done on grading the major <br />disturbances until the corrective action plan is approved <br />which will not be considered until October 18. <br />2. MAJOR ROADSIDE DISTURBANCES <br />a: Correcting the major roadside disturbances cannot <br />be done until the corrective action plan is approved. To do <br />so could risk doing work which would not be approved by the <br />Board. The board will not consider the corrective actior. <br />plan until October 18. <br />b: Removal of disturbance area #4 is estimated [o <br />require 7 to 14 working days to complete. <br />c: Grading of disturbance area #1 is estimated to <br />require from 7 to 10 days to complete. <br />d: Topsoiling of disturbance areas #2 and #3 will <br />require about one day to complete. <br />e: Topsoiling of disturbances #1 and #4 will take at <br />least one day each. <br />f: Seeding of the four areas will take from one to two <br />days to complete. <br />SEDIMENT BASIN - <br />a: The design of the sediment basin must be based on <br />accurate topographic mapping of the watershed above the pond <br />area. The topography in this area was modified as a result <br />of the installation of the water storage pond and therefore <br />the existing mapping of that portion of the drainage is no <br />longer accurate. Such current mapping does not even exist <br />and would take from one to four weeks to create, depending <br />upon the method used. <br />b: Construction of the sediment pond, once designed <br />and approved, will probably take from two to five weeks. <br />