Laserfiche WebLink
6 • <br />• ~ ilf. Comr~ents - Compliance <br />• .~, <br />pa Below ere comments orl the inspec'tloii:•:The comments includn~dtscusslon of <br />ouservetlons maoe.•,during tie Inspection. Comments elso descrfUe any <br />enforcement n:tfdhs taken durfny the tnspe:tion and the facts or evidence <br />• supporting the enfgrcemont action. <br />• pond had receirtl,v bean discharged. <br />NB-2: •At the time of the ieepeetion,'water from M8.-6 wsa being <br />pumped into MB-'L. Flocculent wes being added at the <br />inlet to M8-2, The other inlet to HB-2.4MMa flos+ing. <br />Flocculent was also being added and settling immediately <br />upon entering the pond. <br />NB-3s ,, '~~At the time ~f thgrinapep~iolq MB,-8r held a small mount of 1 <br />', water. ii `y ~ `. ''4 <br />MB-4: The operator is considering installing an oil skimmer in <br />MB-4. Iri addition, a gated principal spillway is bein4 <br />conatdered. d revision would be requir~~r;;xo install <br />either of the items. Hay baler located across the <br />emergency spillway should be removed, or designs should <br />be provided. <br />NB-6: Water level wee over the gated openinb~ but the pond was <br />not discharging. <br />NB-8: Tl:e pond had begun to be cleaned prior to the rainstorm. <br />Material pushed out of the pond should be removed and <br />transported to the refueo pile. This tank began prior to <br />the conclusion of the ir~epection. Water was being pumped <br />to MB-2 do attempt to further dr•y out the pond ao <br />cleaning could continue. <br />Y•. <br />1 ` <br />.l <br />wY.~.~. <br />