My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE29711
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE29711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:40 PM
Creation date
11/21/2007 12:21:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Enforcement
Doc Date
9/7/1993
Doc Name
Request for Vacation & Information on NOV
From
ARCO
To
DMG
Violation No.
CV1993112
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:, <br />a <br />(fi. Comments - Compliance <br />!. ., Below are comments ort the inspection. The commonts intludc~d(scusston of <br />ouservations rnzaa•.durtng tits inspection. Conment; also describe any <br />. enforcement actidns taken during the inspection end the facts or evidence <br />supporting the enforcement action, <br />The operator plans to constrr.tet a roof over the barrel atornge area <br />next to the fuel bay. A revision should be provided to the <br />Dtviaion prior to construction of the roof. <br />TOPSOIL <br />:*.µ~<:, <br />' All topsoil and subsoil resources should continue to be protected <br />from wixtdl,pnd water, ervaion. ,Th¢~ Div~r~on, would recommend that the <br />operator henna ua`ing $ubso~l L3r Eorihtttrcillon pro,~ects untillnn ~ <br />accurate topsoil balance can be estinated. This is currently being <br />oaloulat•ed in Technical Revision No. 64. It was determined that <br />two topsoil piles, fobmally located along the 6ylvester Oulch road, <br />hnd bean moved to the hetiches of the refuse pile wi,1;,I~p~tt appror•al ' <br />from the Division. Therefore, NOV C-93-113 was issued. <br />POLL AND DEVELOPHElIT WAS TG <br />At.the Lime of the inspection there was one area on the western <br />slope of the pile that was conveying water over the ~fnce aP the <br />refuse 1,ile. This was evidenced by the formation o! rills that <br />beyart at the top of the pile. Prior to the conclusion of the <br />inspection, the operator constructed a berm in this area to prevent <br />water Prom flowing over the fare of the pile. 'The operator <br />continpns and should continue to maintain a berm and silt fence <br />around the yerimeter oP the pile, at the top of the pile. MCC <br />' should cotoplete the reclamation of the western side oP t}te refu:e <br />pile, including seeding, prior to the end of ttris field season. <br />' :•. <br />POfID REPORT <br />~~ <br />.. ~ <br />, r . ,. <br />ti8-1: The oparator'a pond inspection report for .the second <br />quarto r• oP 1999, noted a seep at the Nir corner of the toe <br />of the embartl'.ment near the Sw corner of the surface shop. <br />~. At th? time of the Dlviaiort's inspection the embankment <br />was damp, and there was standing water of the gravel pad <br />below the enbanlunertt. 7'hure are cattails growing, which <br />is evidence that the beep has bean active for some time. <br />This area should continuo to be monltored,.to identify <br />the source oC the water. There ware some cracks noted on <br />the north side of the pond, on top of the embankment. I <br />' am not au re iC the ct•acka ace related to settlement or <br />ir,stabilit}• oP the cmbanl:ment, The cracks should <br />continue to be monitored to determine for signs of <br />instability, The w•at.ex• level in MB-1 was low, as the <br /> <br />. ~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.